Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring2 <br /> 4.8-1(b) The Specific Plan should identify all techniques proposed to Review at SP stage. SJCCDD SP <br /> minimize the visibility of urban development south of Grant <br /> Linc Road. Such techniques could include building setbacks, <br /> landscape screening, use of berms, fencing, and low building <br /> heights. <br /> 4.8-1(c) To maintain the rural character of the surroundings, Review of SP SJCCDD; SP and C <br /> additional landscaping with evergreen trees should occur landscaping standards. SJCBD <br /> along the existing mayor roads, which include Patterson Pass Verification of <br /> Road, Byron Road, and Grant Line Road (Figure 4.8-10). compliance with SP <br /> These trees should be planted so that the canopies of the landscaping standards. <br /> trees touch one another at maturity and form a solid edge <br /> along the roads. <br /> 4.8-1(d) Additional screening by trees should be provided along Old Review of design SJCCDD SP and C <br /> River and a small waterway adjoining Old River at the site's during SP and <br /> northeast corner Figure 4.8-10). Along Old River, the verification of <br /> landscaped area s ould be planted with species of trees and compliance during <br /> shrubs compatible with existing riparian vegetation. Species construction. <br /> should also be chosen to provide effective screening so that <br /> the public using the levees for walking or bicycling would <br /> have a limited view of development on site. Similarly, at the <br /> small waterway. riparian landscaping should be provided. <br /> 4.8-1(e) Landscaping plans should be clearly identified in the Specific Review at SP stage. SJCCDD SP and PC <br /> Plan for both existing and proposed roadways. Such plans <br /> should be used by a design review committee established for <br /> this project and responsible for design review prior to <br /> construction. <br /> 4.8-1(0 'Ihe Specific Plan should include a comprehensive sign Review at SP stage. SJCCDD SP <br /> program for the proposed C-FS district which would limit <br /> pole signs to a single identifying sign for the FS area; height <br /> and size restrictions should be imposed where feasible to <br /> lessen the visual impact. <br /> 'SJCCDD:San Joaquin County Community Development Department; SJC13D:San Joaquin County Building Division;SJCDPW San Joaquin County Department of Public Works;USACE: U.S.Army Corps <br /> of Engineers; SJCFCE: San Joaquin County Flood Control Engineer; CSD:Community Services District (of project); RWQCB: Regional Water Quality Control Board;CDFG: California Department of Fish <br /> and Game;SJCEHD:San Joaquin County Gnvimnmental I lealth Department; DI IS:California Department of liealth Services;LAFCO:Local Agency Formation Commission. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage; SP: Specific Plan stage; PC: Pre-construction stage: (includes Tentative Map approval or and Final Map approvals and other discretionary application <br /> approvals) Construction stage (prior to building permit issuance); O: Operational stage. <br />