Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Biological Resources <br /> Table 7.1 continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring' <br /> 4.13-4(d) Prior to approval of the Specific Plan, a survey should Review at SP stage. SJCCDD SP <br /> be conducted along the banks of Old River extending <br /> the length of the project site to confirm the presence of <br /> the California hibiscus, a Federal candidate 2 species. <br /> This survey must be done In August and September, <br /> theplant's blooming period. <br /> 4.13-4(e) A survey should be conducted of Old River along the Review at SP stage. SJCCDD SP <br /> segment bordering the project site to confirm the <br /> presence or absence of the Delta smelt. The survey <br /> should be conducted with the use of an otter trawl at <br /> intervals during the spring spawning season and prior <br /> to approval of the Specific Plan. If the species were <br /> detected, policies and specific measures for Its <br /> protection should be incorporated Into the Specific <br /> Plan. <br />