Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.15-1(h) The mixture of land uses within the project should attempt Review at SP stage. SJCCDD SP <br /> to locate mutually-supportive land uses in proximity to one <br /> another to reduce trip generation or vehicle miles travelled. <br /> Locating neighborhood commercial services, day care, <br /> schools. and playgrounds within short distances to residential <br /> uses would be an example of such mutually-supportive land <br /> uses. Providing commercial services such as banking, <br /> restaurants, or fitness centers in close proximity to <br /> employment-generating uses would be another appropriate <br /> land use mix. <br /> 4.15-I(i) The County should incorporate a requirement for an air Review at General SJCCDD GP adoption <br /> quality mitigation fee as part of the Development Title. Plan/Development <br /> Such a fee could be imposed when new projects generating 'title adoption. <br /> more than 200 trips per day are not able to reduce trip <br /> generation by at least 25 percent. This fee could be used for <br /> air quality improvements such as park and ride facilities. <br /> transit, and vehicle inspection. <br /> 4.15-1(1) Industrial or commercial operations with equipment Review prior to SJCCDD As needed <br /> that causes or has a potential for air pollution or that construction prior to <br /> controls such air pollution may need to apply for an con- <br /> Authority to Construct and Permit to Operate according struction. <br /> to regulations of the San Joaquin Valley Unified Air <br /> Pollution Control District. <br /> 4.15-2 The project would increase the 4.15-2(a) Prior to adoption of the General Plan amendment, buffer Review at GPA stage. SJCCDD GPA <br /> potential for air quality and odor- zones between existing agricultural lands and residences <br /> related land-use conflicts. should be provided. The size of the buffer zone should he <br /> determined by the type of agricultural activities involved, <br /> with a larger buffer required where the agricultural activities <br /> require frequent tilling. waste burning, or pesticide <br /> application. A minimum of LOCK) feet is recommended (see <br /> Alternative 5.5). The buffer zone could consist of a mixture <br /> of open space, compatible land uses (such as a water <br /> treatment plant. sonic commercial uses, sonic clean <br /> industrial uses). recreational uses. landscaped areas. streets, <br /> or other non-intensive uses. <br /> 'SJCCDD:San Joaquin County Community Development Department; SJCBD:San Joaquin County Building Division;SJCDPW San Joaquin Comity Department of Public Works;USACE: U.S.Army Corps <br /> of Engineers; S.ICFCE: San Joaquin County Flood Control Engineer; CSD:Community Services District (of project); RWQCB: Regional Water Quality Control Board;CDFG: California Departtnent of Fish <br /> and Game;SJCL'HD:San Joaquin County Environnmental I lealth Department;DI IS:California Department of health Services;t.AFCO:Local Agency Formation Commission. "Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage: SP: Specific Plan stage: PC: Pre-construction stage: (includes -Tentative Map approval Pr and Final Map approvals and other discretionary application <br /> approvals)- Construction stage (prior to building permit issuance); O: Operational stage. <br />