Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring= <br /> 4.16A(c) All stationary noise-generating construction equipment, such Verification of SJCCDD C <br /> as air compressors, should be located as far as possible from compliance. <br /> existing residences. Such equipment should be acoustically <br /> shielded where possible. <br /> 4.16-4(d) Quiet construction equipment, particularly air compressors, Verification of SJCCDD C <br /> should be selected whenever possible. I compliance. <br /> 'SJCCDD:San Joaquin County Community Development Department:SJCBD:San Joaquin County Building Division;SJCDPW San Joaquin County Department of Public Works;USACE: U.S.Army Corps <br /> of Engineers;SJCFCE:San Joaquin County Flood Control Engineer: CSD:Community Services District(of project); RWQCB: Regional Water Quality Control Board;CDFG:California Department of Fish <br /> and Game;SJCEHD:San Joaquin County Environmental Health Department;DIIS:California Department of Health Services;LAFCO:Load Agency Formation Commission. Those responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> d GPA: General Plan Amendment stage; SP: Specific Plan stage: PC: Pre-construction stage: (includes Tentative Map appFeval or.and Final Map approvals and other discretionary application <br /> approvals' Construction stage (prior to building permit issuance); O: Operational stage. <br />