My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Fact : <br /> • The approval of the Project is subject to the <br /> following conditions which assure identification and <br /> prevention of potential PCB exposure, and <br /> identification and minimization of potential EMF <br /> impacts by requiring setbacks from transmission lines <br /> and educating the public regarding the potential <br /> health risks from overhead electrical lines . <br /> • The Applicant must request information trom PG&E on <br /> the presence of any transformers containing PCBs , and <br /> any records of spills from such equipment . If <br /> PCB-containing equipment ( 50 to 500 parts per million <br /> PCBs in the oil) or PCB equipment (over 500 parts per <br /> million) were identified, this equipment must be <br /> replaced with non-PCB containing equipment . Any <br /> identified spill areas must be evaluated for <br /> cleanup . The Applicant shall be responsible for the <br /> costs of testing and replacing PCB-containing <br /> transformers . <br /> • The Applicant must request information from PG&E on <br /> the calculated strengths of the electric and magnetic <br /> fields generated by the Weber-Herdlyn and Rio <br /> Oso-Tesla lines , and the proposed Rancho Seco-Tesla <br /> line . Field strengths should be identified at the <br /> existing edges of the rights-of-way and at 50 , 100 <br /> and 200 feet from the edges of the rights-of-way. <br /> Field strengths should be calculated for a range of <br /> loading conditions including average load and maximum <br /> anticipated load. <br /> • Land adjacent to transmission line easements must be <br /> planned for recreational use or open space, to the <br /> maximum extent possible . The Applicant must continue <br /> to evaluate the field strength information for the <br /> existing and proposed transmission lines in light of <br /> new research findings to identify whether setback <br /> distances for structures intended for human occupancy <br /> would be appropriate. <br /> • The proposed high school and elementary school south <br /> of Grant Line Road and adjacent to existing and <br /> proposed electrical transmission line easements shall <br /> be relocated. This relocation must be identified in <br /> the Specific Plan. <br /> • The Applicant must develop public informational <br /> material on the potential health problems caused by <br /> exposure to EMF from all sources , including overhead <br /> C2-56 <br /> 0189r/0202r <br />
The URL can be used to link to this page
Your browser does not support the video tag.