Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for WESTERN FOOD & FUEL as of Apri115, 2020. <br /> Open violations from December 03, 2019 inspection <br /> Violation #113 - Failure to submit "Monitoring System Certification Form" within 30 days of completion of <br /> the test. <br /> OBSERVATION A monitoring system certification, leak detector testing, and spill container testing were performed <br /> on 12/11/18. A test report has not been submitted to the EHD or the California Environmental Reporting System <br /> (CERS). <br /> REGULATION GUIDANCE A copy of the test report must be submitted within 30 days of the test. <br /> CORRECTIVE ACTION. Immediately provide this report to the EHD. <br /> t( This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents Included � <br /> Describe actions taken or will be taken to correct violation: <br /> If a v.S r L 1 -1- S, i �`•-, j <br /> o � <br /> i <br /> Violation #121 - Failure to implement corrections and submit written response within 30 days of receiving ' <br /> the report. <br /> OBSERVATION An inspection was last done on 12/11/18 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 1 /10/19. This information has not been fully received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE An operator that receives an inspection report shall have 30 days to Implement the <br /> corrections specified in the Inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted t. <br /> tted and all corrections implemented within 30 days of receiving an inspection report <br /> Q This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included i <br /> Describe actions taken or will be taken to correct violation: <br /> wkyo%w Ll�) n �� ✓� <br /> e7 0 d <br /> r <br /> Page 1 of 4 <br />