Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: 7/17/2019 <br /> If you already have a site plan that shows all required information,you may include it rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring product piping,5)devices monitoring fillpiping,6)devices monitoring ventpiping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> SiMAdd n: SB Gas Market 515 W 11'h St Tracy CA 95376 <br /> . . . . . . . . . . <br /> =PIPLN G 4 _ <br /> (ARROWS) <br /> Dta^rL.=of pipuv . . _ . . _ <br /> ent of sump ar_d . . . . . . <br /> UDC's.No <br /> underisiound <br /> dray==-L i✓.t�vi - 6. 2 S{ <br /> r-e:a=ct <br /> speculate blue <br /> .p. 1 <br /> 87 91 <br /> ,I.LJA <br /> TG <br /> P <br /> T' •.-. ... .CAS. <br /> c <br /> .000 VENTS <br /> T <br /> A UL AR <br /> O DSL a F=FILLS <br /> T=TLTiBI\E <br /> �r P=PROBE <br /> F V_"'.VOR <br /> F X=Sn1PSENSOR <br /> . _ _ . _ . . <br /> L=PLLD <br /> xl=llamcav <br /> B=Brine Sensor <br /> A item:undergroundthinare not rcible to rhscviUS- g technician area S=Smart Samor <br /> prgf&-:ional apinion on{•;and are:olah for bj1brmaiona1poposst. Drawk <br /> not to scala <br /> Date rnap was drawn 7!17119 <br /> Instructions <br /> If you already have a diagram that shows ali requited information you may incluce it,rather than this page,wilt your Monitoring System Certification. On your site plan, <br /> shots the genera!layout of tanks and piping. Clearly dentify locatons of the following equipment,if installed:mon Loring system coetrol panels;sensors monitoring tank <br /> annufar spaces,sumps,dispenser pans,spill containers,or other secondary comanment areas:mechanical or electronic fine leak detectors and in-tank 6qu;d levet <br /> probes(if used for ieak detection). In the space prov ded,note the date chis Site Pan was prepared. <br /> LEGEND <br />