My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2200 - Hazardous Waste Program
>
PR0514248
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 1:43:41 PM
Creation date
6/3/2020 9:06:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514248
PE
2220
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0514248_2526 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Stacy Rivera [EH] <br /> From: Anthony A Johnson Uohnsonaa@dteenergy.com] <br /> Sent: Wednesday, May 16, 2012 2:53 PM <br /> To: Stacy Rivera[EH] <br /> Subject: DTE Stockton <br /> Ms. Rivera <br /> I received pictures from your recent inspection with your card stapled to it I believe these are just our copies of what <br /> you will be placing in our file as there wasn't a letter enclosed. At this time we only have two outstanding items. I have <br /> scheduled a waste pickup for tomorrow, May 17th and another for May 24th to remove the empty barrels. The one <br /> sticking point that we have is with the integrity testing. I saw on our inspection report that we are to list what we have <br /> done or are doing to correct the deficiencies. We have contacted a vendor to develop a testing plan and they had a <br /> technician do a site visit. Establishing a new vendor can include negotiating terms and conditions between the two <br /> companies and may push us past our deadline. The vendor also stated that they would not release the test results until <br /> payment is received, normally our terms are net 30. Is it acceptable for us to not complete this item if we show we are <br /> proceeding with the testing?I am not saying we won't make the deadline but would like feedback to where we would <br /> stand if we can't complete this on that time table. <br /> Thank You <br /> Anthony A Johnson <br /> DTE Stockton <br /> (209)320-3714 <br /> johnsonaa@dteenergy.com <br /> 6/20/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.