Laserfiche WebLink
-3- <br /> VI .A. 3 (a-b) Containment far I nitable o Reactive Wastes <br /> 264 . 176 Provide a diagram demonstrating that the <br /> locations of the ignitable and reactive wastes <br /> have a 50 foot buffer zone and the location of <br /> berms used to separate the wastes from each <br /> other. <br /> VI.A.4 Storage of PCB -Wastes <br /> The storage of PCB wastes must meet all of the <br /> requirements of 40 CFR Part 761. Provide <br /> information in the revised OP demonstrating <br /> compliance with 40 CFR Part 761. <br /> VI.A.5 Certification Statement <br /> 270.14 (a) Include a statement in the revised OP <br /> certifying that an engineer registered in <br /> California has approved the design and <br /> construction of the container storage area. <br /> VII.A.2 Safety Features on Waste Handling Equipment <br /> Identify the safety equipment on the forklift. <br /> VII.G. (1-2) Water Supplies <br /> Provide the locations of backflow prevention <br /> devices on the potable water supply around the <br /> base. <br /> VIII.B.le Equipment Decontamination <br /> Describe procedures to ensure that equipment <br /> contaminated with waste is decontaminated <br /> before being serviced or used in a nonhazardous <br /> waste area. <br /> VIII.B.lf Aisle Space <br /> 264.35 Demonstrate that aisle space is sufficient to <br /> allow unobstructed movement of emergency <br /> equipment and personnel. Specify the width of <br /> the aisles. <br /> VIII.B.2 Collection and Disposal of Wash Water <br /> Identify methods of collection and disposal of <br /> washwater used to decontaminate equipment. <br />