Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> 1 <br /> SITE SAFETY PLAN <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> Site will be secured as follows: <br /> Work Zones will be marked as follows: Barricades and/or caution tape will be used to mark off work <br /> zone. <br /> MARK WORK ZONES ON SITE MAP O CHECK WHEN DONE. <br /> On-site communications: ❑ Radio I] Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio ® Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: On Sargent Road <br /> MARK EVACUATION ROUTES) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> 1 All contaminated personal protective equipment (i.e., gloves coveralls) will be placed in bin along with <br /> soil or will be drummed separately. <br /> 1 Location of Wash Water. Vehicle and Bathroom N. of Work Zone <br /> Location of Toilet. Immediately North of Work Zone <br /> Location of Drinking Water. Vehicle and Bathroom N. of Work Zone <br /> ' MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN DONE <br /> PAGE 6 <br />