Laserfiche WebLink
Mr. Becker(DTSC) and Lt. Vielhauer (DFG) <br /> Page 5 of 5 <br /> specify a final remedy that is protective of human health and the en lrO�e t. Wecompletionomme of that <br /> a scoping session be scheduled with the oversight agencies following <br /> the <br /> confirmation sampling to specify the parameters of any additional characterization that is needed. <br /> General Protocols <br /> All fieldwork will be conducted in accordance with Ground Zero's Quality Assurance/Quality <br /> Control Plan(Attachment C) and our Site Specific Health and Safety Plan(Attachment D). <br /> If you have any questions or comments please contact Ground Zero at your earliest convenience. <br /> -Z - <br /> osesz <br /> '�� 5-® Gf Qt <br /> Respectfully, c, O <br /> Ground Zero Analysi c. ® c�tp <br /> GREGORY P. <br /> STAG L <br /> Gregory P. Stahl,RG 5023 No. 5023 <br /> CA Certified Hydrogeologist No. 264 <br /> OF ULo�°� <br /> Attachments <br /> cc: Mr. Chris McDougall,Marina West Marine Services <br /> Mr. Mike Spence,Village West Marina <br /> Mr. David Irey,Esq., Office of the District Attorney, San Joaquin Co. <br /> Mr. James L.L. Barton, CA Regional Water Quality Control Board <br /> Ms. Michelle Le, San Joaquin County Environmental Health Dept. <br /> j <br /> �L <br /> \\GZA FS\VOL_1\DATA\GROUNDZE\MARINA\REPORTS\Workplan.doc <br /> I <br />