Laserfiche WebLink
BMP(STRUCTURAL AND NON-STRUCTURAL) POLLUTANT SOURCE/AREA IMPLEMENTATION SCHEDULE <br /> Double contain compressor lube oil Oil and Grease 2-29-08 <br /> containers <br /> Establish compressor maintenance program Air compressors ✓ <br /> Remove hydraulic fluid from unused truss Back lot 2-29-08 <br /> stacker <br /> Cover material stored outside Galvanized sheet steel ✓ <br /> Remove 300 gallon propane storage tank Petroleum hydrocarbons 2-29-08 <br /> Inspect roof mounted air conditioning units Lubricants ✓ <br /> Install oleophilic materials in catch basin Hydrocarbon removal ✓ <br /> inlets <br /> Maintain air compressor oil water separators Contaminated condensate ✓ <br /> Attach bar magnet to fork lift truck Iron fasteners, dust, 2-29-08 <br /> particulates, and trimmings <br /> Prepare drop inlet bag protector maintenance Parking lots ✓ <br /> program <br /> Install spill/leak controls on roll forming Factory 2-29-08 <br /> e ui ment <br /> NexFrame LP-WDID#5S30i020707 November 1, 2007 <br /> SWPPP 11- <br />