My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BESSEMER
>
1019
>
2200 - Hazardous Waste Program
>
PR0514284
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 1:10:51 AM
Creation date
6/3/2020 9:20:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514284
PE
2226
FACILITY_ID
FA0010328
FACILITY_NAME
MOUNTAIN VALLEY EXPRESS INC
STREET_NUMBER
1019
STREET_NAME
BESSEMER
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22104067
CURRENT_STATUS
01
SITE_LOCATION
1019 BESSEMER AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2226_PR0514284_1019 BESSEMER_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAZARDfUS WASTE CONTING4?NCY PLAN <br />For use by Unidocs Member Agencies or where approved by your Local Jurisdiction <br />AuthorityCited. Title 22, California Code of Regulations (CCR) §66265.52 as referenced by §66262.34(a)(4) or 67450.3(c)(9)(C) <br />Facilities that generate 1,000 kilograms or more of hazardous waste per month, or accumulate more than 6,000 <br />kilograms of hazardous waste on-site at any one time, must prepare a Contingency Plan. Facilities that generate <br />in any month more than 1 kilogram of acutely hazardous waste (AHW), or more than 100 kilograms of debris <br />resulting from the spill of an AHW, or which treat hazardous waste onsite under the Permit by Rule (PBR) <br />onsite treatment tier must also prepare a Contingency Plan. Many facilities that are required to prepare a <br />Contingency Plan are already subject to Hazardous Materials Business Plan (HMBP) reporting requirements <br />due to the quantities of hazardous materials/wastes they have onsite. If you have already prepared a Unidocs <br />_ _ _ • • • .f r _ T___.__./!1__a_��_.._-. iii.._ <br />This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br />immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br />hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br />the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br />local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency <br />with whom special (i.e. contractual) emergency services arrangements have been made (see Section E, below). <br />A. Facility Information: <br />BUS,SS NAME jBUSINESS PHONE. <br />V�i_[ <br />SITE ADDRESS CITY ZIP CODE <br />B. Emergency Coordinators: <br />All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note: <br />Emergency Coordinator responsibilities are described in Section F, below) If more than two people are <br />qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br />qualified individuals on an attached page in the order in which they will assume responsibility as alternates, <br />then check the box beneath the Emergency Coordinator information table, below, and indicate the list's page <br />number in the space provided. <br />Prima <br />Emer enc Coordinator <br />Seconda Eme enc Coordinator <br />NAME <br />Cao • --cK <br />NAME <br />t�' �• C'{i/�1, <br />r <br />®c <br />TITLE <br />TITLE <br />BUSINESS PHONES ,._ <br />�-. p _ , <br />P,yBUSINESS PHONE <br />e7 <br />24-HOUR PHONE <br />24-HOUR PHONE r <br />PAGER# <br />PAGER# <br />(Check box only if applicable) Additional Emergency Coordinators are listed on page of this plan. / <br />C. Evacuation Plan: <br />1. The following alarm signal(s) will be used to begin evacuation of the facility (check all that apply): <br />❑ Bells; ❑ Homs/Sirens; gVerbal (i.e., shouting); ❑ Other (spec <br />UN -017 -1/6 Wwwxnklomarg Rev. 03/27/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.