Laserfiche WebLink
06/30/2006 13:50 9163532375 NES PAGE 02/05 <br /> Network Environmental Systems, anc.�, <br /> June 30, 2006 <br /> Lori Lu.ces R.E.H_S. <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, 3'd Floor <br /> Stockton., Ca. 95202-2708 <br /> Subject: Return to Compliance CertifIcation for Stockton Unified School District, <br /> 1932 N.El Piinal Drive, Stockton, California <br /> Ms. Luces, <br /> Network Environmental Systems (NES) is submitting the attached Return to Compliance <br /> Certification on behalf of the Stockton Unified School Districi (SUED); The facility received <br /> a. Notice To Comply during an inspection on May 1, 2006 with a return to compliance <br /> deadline of June 1, 2006, in a letter dated May 22, 2006, NES requested an, extension of the <br /> return to compliance deadline to July l., 2006 for the items addressed below. The following <br /> statements and attached documents address the following items identified on the Notice to <br /> Comply. <br /> Item Number 94: A facility specific Spill. Prevention Control & Countermeasures (SPCC) <br /> planhas been. prepared for SUSD. The SPCC plan covers the storage of petroleum-based <br /> materials and wastes stored in aboveground tanks and containers. The SPCC plan has been <br /> .reviewed and. certified by a Califomi,a Registered Professional. Engineer as required by <br /> 40CFR §112.3(4), and a copy of the Certification. Page with the engineer's signature and <br /> registration stamp are attached. <br /> Item Number 64: The required elements for the certification of the 500:gallon used oil tank <br /> are found in the Spill Prevention. Control & Countermeasures (SPCC) Plan.. The engineer's <br /> certification. on the SPCC also covers the required assessment of Stockton. Unified School <br /> District's hazardous waste tank.. <br /> A copy of the completed SPCC plan is available for inspection at the Stockton Unified School <br /> District facility. As required under 40 CFR §11.2.5(b)&(c), all structural and/or procedural <br /> elements of tWs SPCC plan will be implemented not later than 90 days from completion and <br /> certification by a professional engineer registered with the State of California. <br /> 1141 Siblcy Street• Folsom. California 95630• (916) 353-2360 - lax (916) 353-2375 <br /> www.ne.tworkenvii-onrn(!nt.-kl.com • 1 (800) NES-ADVISE <br />