Laserfiche WebLink
AR IVE <br /> VIII. IMPLEMENTATION SCHEDULE OF SOURCE REDUCTION MEASURES <br /> The selected source reduction methods are chosen based on the Matrix and Measure Form referenced in Appendix D <br /> and the detailed evaluation in section VII. The following information is provided for each selected source reduction <br /> method: <br /> Timetable for Implementation <br /> • Scheduled Steps for the Implementation Plan <br /> TABLE 3 <br /> IMPLEMENTATION SCHEDULE <br /> Hazardous Waste Reduction All waste streams Implementation Goal The Committee meeting will be <br /> Committee Meetings July 2005 in July 2005 at the beginning of <br /> the third quarter of 2005. <br /> Subsequent meetings will be <br /> held during the first month of <br /> each quarter to discuss <br /> effectiveness of current and <br /> propose new source reduction <br /> measures. Other meetings may <br /> be scheduled if deemed <br /> necessary by the Committee. <br /> Stockton Unified School District NETWORK ENVIRONMENTAL SYSTEMS,INC. <br /> Hazardous Waste Source Reduction Plan 22 <br />