My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1 1986-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2200 - Hazardous Waste Program
>
PR0513630
>
COMPLIANCE INFO_FILE 1 1986-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2024 4:46:35 PM
Creation date
6/3/2020 9:20:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1 1986-2012
RECORD_ID
PR0513630
PE
2227
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0513630_1932 EL PINAL_FILE 1 1986-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NAR IVE <br /> it <br /> Preventative Maintenance Oily Water Implementation Goal Inspections and preventative <br /> Latex Paint On going maintenance will reduce the <br /> amount of spills/leaks from <br /> equipment that generates waste. <br /> Product Storage Lube Oil Implementation Goal Proper storage of materials will <br /> Latex Paint June 2005 reduce the amount of <br /> contamination or release of <br /> those materials, which generate <br /> wastes. <br /> Standard Operating Procedures Waste Paint Thinner Implementation Goal Develop and update procedures <br /> (SOPS) Oily Water June 2005 will contribute to reduction in <br /> Latex Paint waste stream generation. <br /> Reuse of Paint Thinner Waste Paint Thinner Implementation Goal Reuse of paint thinner will <br /> June 2005 reduce the amount of waste <br /> paint thinner generated. <br /> Clarifier Tank Cleaning Oily Water Implementation Goal Reducing the frequency of <br /> January 2004 pumpouts of clarifier tanks for <br /> sludge removal will decrease <br /> amount of oily water sent for <br /> recycling off site. <br /> Stockton Unified School District NETWORK ENVIRONMENTAL SYSTEMS,INC. <br /> Hazardous Waste Source Reduction Plan 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.