My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1 1986-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2200 - Hazardous Waste Program
>
PR0513630
>
COMPLIANCE INFO_FILE 1 1986-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2024 4:46:35 PM
Creation date
6/3/2020 9:20:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1 1986-2012
RECORD_ID
PR0513630
PE
2227
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
01
SITE_LOCATION
1932 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0513630_1932 EL PINAL_FILE 1 1986-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Matrix or Meas Evaluation <br /> for the Stockton Unified School District <br /> Site Name: Facility Services <br /> Reporting Year: 2002 I.Change in Amounts of II.Technical III. Economic IV. Effects on V. Employee VI State,Local, VII. Releases& <br /> Major Waste Stream: Paint Thinner Hazardous Waste Feasibility Evaluation Product Quality Implications Heath&Safety Fed Compliance Discharges <br /> CWC: 214 <br /> W= 5 W = 3 W = 4 W= 1 W = 5 W = 5 W = 4 Total Sum <br /> Approaches Measures R = R R R R R R RXW <br /> Product Substitution 0 _ 0 00 0 0 0 0 <br /> Input Changes — 0 <br /> p,y 0 <br /> 0 <br /> Not Applicable <br /> Operational 0 <br /> Improvements 0 <br /> Reuse Paint Thinner 5 ' 4 Rftfi 5 2 3 5 1 103 <br /> Production Process ; ; 0 <br /> G: <br /> Change 0 <br /> 0 <br /> Not Applicable 0 <br /> Product Reformulation 0 <br /> .; <br /> Hazardous Waste <br /> Reduction Committee <br /> Meetings 5 4 2 2 1 4 2 80 <br /> Inventory Control 4 $ 5 - 5 3 1 1 1 72 <br /> Administrative Steps Annual Employee <br /> Training 4 5 4 3 5 5 3 116 <br /> Housekeeping 3 5 4 2 4 2 4 94 <br /> SOPs 4 5 4 5 5 2 3 103 <br /> Painter Training 4 5 4 5 5 JIM 2 3 103 <br /> Elimination of school <br /> waste consolidation 5 5 1 1 3 3 4 91 <br /> Other ." 0 <br /> 0 <br /> EM 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.