Laserfiche WebLink
This <br /> requirement is in <br /> the Plan on <br /> page: <br /> 15.Is there an evaluation of available source reduction measures?(CCR ®Yes ❑No 16-20,App D <br /> Section 67100.50)) <br /> 16.Do the evaluations of source reduction measures consider the <br /> following approaches: (CCR Section 67100.50)) <br /> Input changes? ®Yes ❑No❑N/A 16-20,AppD <br /> Operational improvements? ®Yes ❑No❑N/A 16-20,AppD <br /> Production process changes? ®Yes ❑No❑N/A 16-20,AppD <br /> Product reformulation? ®Yes ❑No❑N/A 16-20,AppD <br /> Administrative steps? ®Yes ❑No❑N/A 16-20,AppD <br /> 17.Do the evaluations of source reduction measures consider the ®Yes ❑No❑N/A 16-20,AppD <br /> following factors:(CCR Section 67100.5(k)) <br /> Expected change in the amount of hazardous waste generated? ®Yes ❑No❑N/A 16-20,AppD <br /> Technical feasibility? ®Yes ❑No❑N/A 16-20,AppD <br /> Economic evaluation? ®Yes ❑No❑N/A 16-20,AppD <br /> Effects on product quality? ®Yes ❑No❑N/A 16-20,AppD <br /> Employee health and safety implications? ®Yes ❑No ®N/A 16-20,AppD <br /> Permits,variances,compliance schedules of applicable State,local <br /> and federal agencies? ®Yes ❑No❑N/A 16-20,AppD <br /> Releases and discharges? ®Yes ❑No ❑N/A 16-20,AppD <br /> 18.Does the Plan provide information,such as waste stream constituents <br /> and concentrations,pertinent to the evaluation of the source reduction ®Yes ❑No❑N/A 12-13,App A <br /> approaches?(CCR Section 67100.5(1)) <br /> 19. Is there a specification of, and a rationale for,each technically <br /> feasible and economically practicable source reduction measure(s)being ®Yes ❑No❑N/A 12-13,App A <br /> proposed in the Plan for implementation?(CCR Section 67100.5(m)) <br /> If yes,does the specification include at a minimum a narrative ®Yes ❑No❑N/A 12-13,App A <br /> description of the factors in 67100.5(k)and address system capacity <br /> and efficiency? <br /> 20.Is there an evaluation and,to the extent practicable,a quantification <br /> of the effects of the chosen source reduction measure(s)on emissions and ®Yes ❑No❑N/A App D <br /> discharges to air,water,or land?(CCR Section 67100.5(n)) <br /> 21.Is there a list of alteratives considered but not selected for a detailed <br /> evaluation as a potentially viable source reduction approach?(CCR ®Yes ❑No❑N/A 14,App D <br /> Section 67100.5(0)) <br /> 22.For each alternative rejected,is there a rationale for rejection?(CCR ®Yes ❑No❑N/A 14 <br /> Section 67100.5(0)) <br /> 23.Is there a timetable for making reasonable and measurable progress 22-25 <br /> towards implementing and completing the selected source reduction ®Yes ❑No ❑N/A <br /> measures?(CCR Section 67100.5(p)) <br /> 24.Is there an implementation schedule for completing the evaluation of <br /> potentially viable source reduction measures and includes prioritization of ®Yes ❑No❑N/A 22-25 <br /> processes and wastes for future research,development and source reduction <br /> analysis?(CCR Section 67100.5(p)) <br /> 25.Does the Plan contain a four-year numerical goal for reducing the 21 <br /> generation of hazardous waste streams through the selected source reduction ®Yes ❑No ❑N/A <br /> measures?(CCR Section 67100.5(q)) <br /> 26.Is the Plan properly certified?(CCR Section 67100.13) <br /> Technical Certification ®Yes ❑No❑N/A 1 <br /> Financial Certification ®Yes ❑No❑N/A 2 <br />