Laserfiche WebLink
This <br /> requirement is <br /> in the Plan on <br /> page: <br /> 13.If applicable,does the Report describe factors that,during the ®Yes ❑No 11 <br /> period between the baseline year and the current reporting year,have <br /> affected hazardous waste generation and on-site and off-site hazardous <br /> waste management practices?(CCR Section 67100.8(a)(3)(D)) <br /> 14.When describing factors affecting hazardous waste management <br /> practices at the site, did the generator consider: <br /> Changes in business activity? ®Yes ❑No❑N/A 11 <br /> Changes in waste classification? ®Yes ❑No❑N/A 11 <br /> Natural phenomena? ❑Yes ❑No❑N/A 11 <br /> 15.Is the Report properly certified?(CCR Section 67100.13) <br /> Technical Certification ®Yes ❑No❑N/A 1 <br /> Financial Certification ®Yes ❑No❑N/A 2 <br />