Laserfiche WebLink
State of California—California Environmental Protectio cy Department of Toxic Substances Control <br /> PROJECTIONS <br /> Your 2002 SB 14 Plan or Compliance Checklist has this information: <br /> (25) Provide the following information for this waste stream: <br /> How much waste was generated in the 2002 year? 2782 pounds <br /> Describe the source reduction measure(s)selected to be implemented by 2006(add page if needed): <br /> Standard Operating Procedures (SOPs) <br /> SOPS will be developed and implemented by for painting operations, vehicle maintenance and washing, and <br /> building maintenance. SOPS will be developed with the intent of reducing the amount of waste generated from <br /> operations discharging water into the oil water separator. Managers/Supervisors will be responsible for the <br /> development and implementation of the procedures. Review and assessment of SOPS for each department will <br /> occur annually. <br /> Reuse of Paint thinner <br /> Painting Operationswill recycle the paint thinner for cleaning painting equipment. Currently, the paint thinner is <br /> used once and discarded as a RCRA hazardous waste. Upon completion of the cleaning process, the thinner will <br /> be placed into a labeled container for reuse. The container must remain covered unless thinner is being added or <br /> removed. Paint sludge will settle out at the bottom of the container producing an additional waste stream. The <br /> paint thinner will be skimmed off and reused until it can no longer be used for equipment cleaning. The sludge <br /> and waste paint thinner will be accumulated and disposed of as a hazardous waste. The reuse of paint thinner will <br /> reduce the overall amount of hazardous waste generated from the process of cleaning equipment. <br /> Training <br /> Training will be provided for department managers and facility operators. Training will include job specific <br /> techniques and safety requirements. Training facility operators will decrease the amount of waste generated at <br /> the source by reducing the amount of thinner used and the number of possible spills and leaks that may occur <br /> from operator error. A description of general annual training is provided in Section III - General Administrative <br /> Controls. <br /> Estimate when this source reduction measure will be implemented: June month 2005 year <br /> What is the annual projected source reduction quantity identified in the 2002 Plan? 417 pounds per year <br /> DTSC 1262 <br />