7. 221,000 Gallons Creosote/Fuel Oil Tank no. 8 <br /> a. Existing concrete wall around tank (88 foot diameter x <br /> 5 feet) provides complete containment (227,000 gallons) . <br /> 8. 21,000 Gallon Oil/PCP Tank No. 10 <br /> a. Existing basement under tank (12' x 15' x 12') holds <br /> 16,000 gallons. interconnected nearby shed basement <br /> 12' x 12' x 6') holds 6,000 gallons. Together the base- <br /> ments provide complete containment. <br /> 9. Evaporation Tank (3 cells) <br /> a. Counter measure plan for leaking evaporation cell. <br /> 1. Pump leaking cell into one of remaining two cells. <br /> 2. Divert influent into good cells. <br /> 3. Absorb minor spills and shovel into empty barrels <br /> and transport to Class 1 disposal site. <br /> 10. North and South Oil Separators <br /> IN <br /> a. Counter measure plan for leaking separator <br /> 1. Empty alternate separators to determine which is <br /> leaking. <br /> 2. Divert all flow through good separator. <br /> 3. Pump out contents of leaking separator into good <br /> separator or into retort. <br /> B. Chemical Mixing Areas <br /> 1. ACZA Liquid Mixer <br /> a. Spill Prevention Plan <br /> Mixing spills fall to steel-lined sump below mixer and <br /> are pumped to process tanks. <br /> b. Counter Measure Plan <br /> A large spill which overflows the mixer sump will <br /> drain to the pipe trough and then to the boiler room <br /> basement. (See Tank Farm discussion above regarding <br /> removal from basement.) <br /> X-28 <br />