My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2200 - Hazardous Waste Program
>
PR0541715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:44:59 AM
Creation date
6/3/2020 9:22:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541715
PE
2227
FACILITY_ID
FA0004061
FACILITY_NAME
MCCORMICK & BAXTER CREOSOTING
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14520001
CURRENT_STATUS
02
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0541715_1214 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Mailing Address: <br /> P.O.Box 1728 <br /> Stockton,California 95201 <br /> Location: <br /> Washington&Pershing Streets <br /> (11 (Stockton,California 95203 <br /> i�1 +�✓�� 1` fl 4. i�r 1 1, �e, ..'�.rl 1J1 Telex No 35-9420 <br /> WOOD <br /> WOOD DESERVES <br /> CREOSOTING CO. PRESERVING <br /> January 17, 1989jo <br /> ' 3 a <br /> Re: Process Spill - Retort 5 � <br /> 1. Owner: McCormick & Baxter Creosoting Company <br /> P.O. Box 3048 <br /> Portland, Oregon 97208 <br /> 2. Facility: McCormick & Baxter Creosoting Company <br /> 1214 W. Washington <br /> Stockton, California 95203 <br /> 3. Process Chemical: Diesel Fuel <br /> Solvent 19 Oil Pentachlorophenol <br /> Pentachlorophenol 7% penta solution <br /> 4. Time of Incident: 1515 (approximate) <br /> 5. Date of Incident: January 10, 1989 <br /> 6. Quantity: (estimated) 2,000 gallons released <br /> (estimated) 97 gallons in soil (see attached) <br /> On January 10, 1989, at the above facility, a process spill of oil penta <br /> occurred in the area of treating cylinder #5 (retort 5) . At approximately <br /> 3:15 PM, the hydraulically operated retort door was opened by the Fireman <br /> (Syed Shah) and the Doorman (Albert Ramirez) . A sudden release of oil-penta, <br /> indicating that the retort had not been completely emptied, filled up the <br /> concrete sump in front of the retort. By the time the door was forced <br /> closed, the sump had overflowed. The oil proceeded in a westerly direction, <br /> over a soil base under tt-ie retort, to the rear concrete sump. All of the <br /> released oil was contained in the area directly under retort 5. <br /> Cleanup was implemented immediately after the retort door was closed. The <br /> front sump was pumped out to the rear sump. The free flowing oil under the <br /> retort was pumped back into the retort through an opening on top of the <br /> retort. Unreclaimed oil under the retort was cleaned up and put into drums <br /> and labeled hazardous waste. <br />
The URL can be used to link to this page
Your browser does not support the video tag.