Laserfiche WebLink
Hazardous Waste Training Questionnaire <br />Note: This quiz is intended to accompany the Self -Study Hazardous Waste Generator Training <br />video and could be used to satisfy the annual employee training documentation requirement. <br />Employee Name: J el eta -n U-}'1 CL Y 1 ' Date: <br />1. To be safe, when is the best time to mark the accumulation start date on a container or <br />tank of waste? <br />a. When the container or tank is full <br />b. During the inspection when the inspector says to <br />When the first drop is added to the tank or container <br />d. Let the hauler do it <br />2. If you area Small Quantity Generator (SQG); meaning you generate 100-1,000 kg (1/2 to <br />5 x 55 gallon drums) of waste per month, how long can you store your waste onsite? <br />a�. 90 days <br />b. 180 days <br />c. One year <br />d. No storage time limit <br />Rules for storage times are based on how much waste you generate, in kilograms. <br />Approximately how much is 1000 kilograms? <br />a. 5 tons <br />Five 55 -gallon drums <br />c. 55 gallons <br />d. 5000 pounds <br />4. Which of the following information is NOT required to be on a hazardous waste label <br />while storing it onsite? <br />a. EPA ID Number <br />"Hazardous Waste" <br />c. Business Name and address <br />d. Physical state of waste <br />5. Which of the following is NOT a requirement for container management? <br />Closed except when adding or removing waste <br />b Designed specifically for hazardous waste storage <br />c.. Kept in good condition <br />d. Labeled when holding waste <br />6. Which of the following wastes may be shipped using a consolidated manifest? <br />a. Antifreeze <br />b. Parts washing solutions <br />d�Used oil <br />All of the above <br />7. How do you know what to do and/or where to send, the six different copies of a <br />manifest? <br />QIt's printed in the bottom corner of the manifest <br />b. I don't need to, the transporter is responsible after signing <br />