My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
901
>
2200 - Hazardous Waste Program
>
PR0515964
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 1:00:41 PM
Creation date
6/3/2020 9:22:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515964
PE
2228
FACILITY_ID
FA0012399
FACILITY_NAME
SWIFT TRANSPORTATION
STREET_NUMBER
901
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
APN
19822009
CURRENT_STATUS
01
SITE_LOCATION
901 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2228_PR0515964_901 DARCY_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> W.O.# AST-6703016 <br /> iTanknology Inc. <br /> 11000 N.MoPac Expressway,Suite 500 Austin,TX 78759 (800)964-0010 Policy 100-29-A <br /> JOB CLEARANCE FORM& Rev:D <br /> 4 4W SITE SAFETY CHECKLIST-OVF Revised:184/2014 <br /> Site Name!#: Street Address: 9O/ ogAr- <br /> yo,Q12,4 w•4y W.O.# <br /> P — L S33D (070 � <br /> Arrval Time: DeiSA <br /> ure Tim ravel Time: Others on site: Date <br /> s6� <br /> Scope of Work and Tasks Prtl 's must be7-12 <br /> available for all tasks): <br /> G T <br /> Repairs to Equipment or Parts Provided: <br /> Follow-up actions required;equipment isolated;comments: <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check Items used or mark-N not applicable) <br /> Safety Vest Safety Glasses Gloves ❑ Hearing Protection <br /> k Steel Toe Boots ❑ Splash Goggles ❑ Hard Hat ❑ Other <br /> ✓ PRE-TEST PROCEDURES (Check each item comnfeted or mark ^ if not applicable) <br /> 1. ❑ Discuss safety procedures with site personnel. Nearest hospital: <br /> 2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ❑ Secure entire work area with barricades(cones,flags,and caution tape,pennant flags,or other perimeter guard). <br /> 4. ❑ Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5. ❑ Implement Lockout(fagout per API 1646(when accessing product piping during tasks) <br /> ❑ All applicable equipment disabled during test(s). ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> ❑ Secure nozzles with'Out of Service"bags and nylon ties. ❑ Verify LOTO is complete by trying to operate pumps. <br /> ❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet"connector from the STP(s). <br /> SIGN IN Lead Technician Name <br /> Techngnaure <br /> General Safety Checks: <br /> All <br /> site personnel have been informed. �— <br /> Fuel delivery has been informed. <br /> lure <br /> Is a fuel delivery due today? site Itepresentative Name <br /> LOTO procedures have been discussed and agreed. <br /> Work areas barricaded to protect workers,staff&public. <br /> I have discussed'ob clearance form with technician. <br /> ✓ POST-TEST PROCEDURES(Check each Item completed or mark if not applicable) <br /> 1. ❑ Remove all"Lockout/Tagout"devices. <br /> 2. ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br /> ❑ Leak Detector Threads on STP's Cl Functional Elements&Relief Screws <br /> 3. ❑ Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: Li_ L2_ L3_ L4_ L5_ L6_ <br /> 4. ❑ Check following components operational: ❑ ATG probes,sensors,&caps <br /> ❑ Ball floats,dry breaks&caps ❑ Cathodic protection operational <br /> ❑ Containment sumps are dry ❑ Dispensers&POS operational <br /> ❑ Dispenser panels are replaced ❑ Drop tubes,fill adapters&caps <br /> ❑ Leak detectors&vent tubes ❑ Manhole covers and sump lids <br /> ❑ Monitoring system is operational ❑ Shear valves are open <br /> ❑ Siphon lines and manifold valves ❑ Siphon lines and manifold valves <br /> ❑ STP fittings and bayonet connectors ❑ Vents(not capped,plugged or isolated) <br /> 5. ❑ Remove barricades. <br /> SIGN OUT&OpaiatorVerification of Work"OVF Lead Technician Name nature <br /> General Safety Checks: <br /> Work area has been left tidy&safe. <br /> Site staff are aware of work status including any remaining isolation. Site/Representauve Name nWrvesignature <br /> Changes to equipment are documented and communicated. <br /> All incidents,near incidents,and unsafe situations reported. <br /> Site Representative Comments: <br /> COMPANY CONFIDENTIAL C Tanknology Inc.,2011.All Rights Reserved. <br /> Printed copies ofthis document are uncontrolled. The current version is available in the Tanknol On-Line Document Control S stem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.