My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
901
>
2200 - Hazardous Waste Program
>
PR0515964
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 1:00:41 PM
Creation date
6/3/2020 9:22:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515964
PE
2228
FACILITY_ID
FA0012399
FACILITY_NAME
SWIFT TRANSPORTATION
STREET_NUMBER
901
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
LATHROP
Zip
95330
APN
19822009
CURRENT_STATUS
01
SITE_LOCATION
901 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2228_PR0515964_901 DARCY_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology Inc. <br />11000 N. MoPac Expressway, Suite 500 Austin, TX 78759 (800) 964-0010 t • Policy 100-29-A <br />Rev: D <br />JOB CLEARANCE FORM & Revised: 1/24/2014 <br />SITE SAFETY CHECKLIST — OVF <br />Site Name/#: <br />Street Address:W.O. <br />/��Oy5 <br /># <br />0119 /ZG1Y <br />33-1 <br />Arrival Time: <br />Departure Time: <br />Travel Time: <br />Others on site: <br />Date <br />1q, ID <br />Scope of Work and Tasks Performed (JSA's must be available for all tasks): <br />T <br />Repairs to Equipmen or Parts Provided: rjU.—%tjt"j V ROD <br />Follow-up actions required; equipment isolated; comments: <br />PPE -PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check items used or mark —if ndt Arlo <br />Wety Vest <br />Q Safety Glasses <br />C4 --Gloves <br />❑ { Ft ri r tection <br />L� Steel Toe Boots <br />❑ Splash Goggles <br />❑ Hard Hat <br />❑ Other <br />✓ PRE-TEST PROCEDURES (Check each item completed or mark — if not applicable) <br />1. ❑ Discuss safety procedures with site personnel. Nearest hospital: <br />2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br />3. ❑ Secure entire work area with barricades (cones, flags, and caution tape, pennant flags, or other perimeter guard). <br />4. ❑ Place fire extinguishers and "No Smoking" signs in the work area. <br />5. ❑ Implement Lockout/Tagout per API 1646 (when accessing product piping during tasks) <br />❑ All applicable equipment disabled during test(s). ❑ Secure the circuit breaker(s) with lockout devices and tags. <br />❑ Secure nozzles with "Out of Service" bags and nylon ties. ❑ Verify LOTO is complete by trying to operate pumps. <br />❑ Close ball valves or check valves on product piping. ❑ Disconnect electrical "bayonet" connector from the STP(s). <br />I MIN- a77 4 7�, <br />. s a. . 9� � , � � � <br />Lead Technician Name <br />d Technician Signature <br />�.._.. /1 <br />General Safety Checks: <br />All site personnel have been informed. <br />j 1 <br />r <br />Fuel delivery has been informed. <br />SitO Represen a Name <br />n e e ignature <br />Is a fuel delivery due today? <br />LOTO procedures have been discussed and agreed. <br />� � t � c� <br />/ � ,v <br />Work areas barricaded to protect workers, staff & public. <br />I have discussed job clearan&4orm with technician. <br />✓ POST-TEST PROCEDURES (Check each item completed or mark — if not applicable) <br />1. ❑ Remove all "Lockout/Tagout" devices. <br />2. ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br />❑ Leak Detector Threads on STP's ❑ Functional Elements & Relief Screws <br />3. ❑ Install lead wire seal on all test plugs & leak detectors that were serviced. <br />Count LD threads: L1 L2 L3 L4 L5 L6 <br />4. ❑ Check following components operational: ❑ ATG probes, sensors, & caps <br />❑ Ball floats, dry breaks & caps ❑ Cathodic protection operational <br />❑ Containment sumps are dry ❑ Dispensers & POS operational <br />❑ Dispenser panels are replaced ❑ Drop tubes, fill adapters & caps <br />❑ Leak detectors & vent tubes ❑ Manhole covers and sump lids <br />❑ Monitoring system is operational ❑ Shear valves are open <br />❑ Siphon lines and manifold valves ❑ Siphon lines and manifold valves <br />❑ STP fittings and bayonet connectors ❑ Vents (not capped, plugged or isolated) <br />5. ❑ Remove barricades. <br />Lead Technician Name <br />,--%T chnici ignature <br />' <br />General Safety Checks: <br />r <br />Work area has been left tidy & safe. <br />= 1 <br />Site staff are aware of work status including any remaining isolation. <br />Site presentative Name <br />ite p tative Signature <br />Changes to equipment are documented and communicated. <br />-D 16o.115 <br />All incidents, near incidents, and unsafe situations reported. <br />Site Representative Comments: <br />COMPANY CONFIDENTIAL © Tanknology Inc., 2011. All Rights Reserved. <br />Vrinted copies of this document are uncontrolled. The current version is available in the Tanknology On -Line Document Control System <br />
The URL can be used to link to this page
Your browser does not support the video tag.