Laserfiche WebLink
C. Limitations <br />Field observations of existing construction is characterized by the presence of the <br />calculated risk that all conditions have not been fully revealed by the field observations. <br />The risk is derived from the practical necessity of basing interpretations and conclusions <br />on limited sampling and that the sampling is representative of the overall structure. <br />The observations presented in this report are based on the assumption that the observed <br />conditions do not vary significantly from those disclosed during our field investigation. <br />If any variations or undesirable conditions are encountered during the period following <br />the field investigation, the Engineer should be notified so that supplemental <br />recommendations can be made. <br />The observations and conclusions of this report are intended to present a good overall <br />picture for the suitability of the "tank system" for certification. <br />The report is prepared in accordance with generally accepted engineering practices. The <br />report is limited to a period of five years from the date of preparation. No other <br />warranties, either expressed or implied, are made as to the professional conclusions and <br />evaluations rendered beyond those required by the certification requirements. <br />E11-008 4 Field Observations <br />