Laserfiche WebLink
r ! 0 <br /> Spill Prevention Compliance CoEppration <br /> Periodic Integrity Test Certificate <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: spccolp@,hotmail.com <br /> Client: Chase Chevrolet Contact Person: Alex Robinson, Service Mgr. <br /> Address: 6441 Holman Rd Phone Number: 209-475-6640 <br /> City/State/Zip; Stockton CA 95212 Date of Test: 8-18-15 <br /> Product Stored: Waste Coolant <br /> Tank Information(Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br /> Lube Cube/120 gals/Waste Coolant/Single Wall Steel/UL 142/UL/UL# Not legible/in steel berm <br /> -Description of Secondary Containment Steel Berm <br /> Date of Test 8-12-15 Test Supervisor(s) Todd McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary XX Secondary XX <br /> 1. Steel Thickness Test(in accordance with API-653 and/or STI SP001 (5th edition)-readings <br /> Avg. Steel Thickness tested-AST=2.9mm (.109in.) UL 142 Std. .093in./Berm=2.9mm(.109in.) <br /> System suitable for continued usage <br /> 2. Inert Gas Blanket <br /> Gas Used: Nitrogen CO2: ; Other(specify) <br /> Air Pressure-Test Vacuum Test ; <br /> Initial Reading(document psi/WC readings) Time <br /> End Readings (document psi/WC readings) Time <br /> Duration of Test: %drop <br /> 3. Sonar-Test YN (document db readings) Duration <br /> 4. Camera(visual) model Lorex MC81845/interstitial (Result: P/F) Pass <br /> 5. Hydro-Carbon Sensor(probe)model (Result: P/F) <br /> 6. Hydrology(Water Column) (inches of water column readings) <br /> Duration %Drop Results (P/F) <br /> 7. Other: Inspect Primary Vessel AST, CRDM present, no evidence of leaking product from <br /> primary vessel, system was easily accessible for inspection: No evidence of leak or of any <br /> product/AST raised & anchored to wall AST suitable for continued usage:PASS <br /> TEST RESULTS <br /> 1St-Stage: <br /> Pass XX Fail_(quantify)STEEL THICKNESS TESTED-AST TO AVG.3.0mm (.109in.) <br /> UL 142 MINIMUM STEEL THICKNESS REQUIREMENT IS ..093in/BERM STEEL <br /> THICKNESS IS 2.9mm(.109in.) <br /> 2"d-Stage: <br /> Pass XX Fail_(quantify) NO VISUAL EVIDENCE OF PRODUCT LEAKING <br /> Comments section AST sits in impermeable steel berm with effective secondary containment of <br /> 456 gals. No evidence of any leaks. No visual evidence of weld cracks or breaks, scrapes in protective <br /> coating which might cause a release from the tank system. data on file <br /> Next Scheduled Periodic Integrity Test <br /> Date of Next Scheduled Test 8-18-20 <br /> SPC Corp Representative <br />