Laserfiche WebLink
• <br /> Print Date: <br /> 12/15/2015 Work Instruction <br /> Emergency Spill Response <br /> Page 2 of 7 <br /> Procedure <br /> fI IRST AID <br /> b. Know and follow the directions of those employees who have been <br /> trained in spill containment: <br /> Safety Coordinator and Maintenance Dept. Personnel <br /> c. Know where the spill containment locations area <br /> a. Two in each phase of the building <br /> L <br /> u <br /> SPILL <br /> RESPONSE KIT <br /> TMER N V ( <br /> QNA '. <br /> t <br /> a <br /> , <br /> y, c <br /> 1.0 <br /> a <br /> Spill Kit Contents ` <br /> a. Spill control pillows <br /> Author: Dave Olney <br /> Issue Date: June 16,2015 <br /> Unless marked as a "Controlled Document",this document is uncontrolled if printed, per OP#15. <br /> See the Branch Document Control Rep for a controlled copy. <br />