Laserfiche WebLink
M �51 01111��F' - I <br /># A-Zjr4-31 MIFffi-f• K MWET M - <br />Has the generator accumulated HW at or near the <br />point of initial generation without meeting <br />storage deadlines provided they accumulate no more <br />than *55 gallons of HW or one quart of acutely or <br />extremely HW, and: <br />(A) The waste is accumulated in containers at or <br />near the area where generated and which is under <br />the control of the operator of the process? <br />(B) The waste is held on-site for no more than <br />one year, nor more than 90 days from reaching <br />applicable quantity limits? <br />(C) The initial date of accumulation is clearly <br />marked and visible for inspection on each <br />container? <br />(D) The HW is. ccupatible with the -for accumulation and the container <br />except when necessa� ry to add or <br />(E) The generator complies with <br />66262.34 (e) (2), (3) and (f) (3) ? <br />* Note: If the generator has determined that not all wastestreams generated by a single <br />process or group of processes in the same physical area are compatible, the generator may <br />apply a separate 55 gal. or 1 qt. limit to each group of compatible wastestreams. <br />(Reference 66262.34(e)(2)(A)) <br />Also, if the generator determines that using only one 55 gal. or 1 qt. container to <br />initially accumulate specific compatible wastestreams is not practical or safe, the <br />generator may use a separate container for those specific compatible wastestreams <br />(although this determination is subject to review and approval by the Department at any <br />time). (Reference 66262.34(e)(2)(b)) <br />ince the generator has accumulated an amount of HW <br />equal to any applicable quantity limitation listed <br />in 66262.34(e)(1), has the generator, with respect <br />to that waste, within three days, labelled the <br />container with the date the quantity limit was <br />reached and cxmplied with 66262.34(a)? <br />111tbxr-1 <br />ff <br />If 'the generator does not have a permit or interim <br />status (as a TSD facility) have they accumul. I ated <br />HW on-site for less than 90 days (except: as <br />Provided under 66262.34(d))? (66262.34(a)] <br />NOM: For generators of not more than 100 kg/mo. of M nor 1 kg/mo. of acute or extremely <br />34, the 90 day period begins on the date the generator has accumulated 100 kg (or 1 kg) <br />(Reference 66262.34(b) and 25123.3(b)) <br />Revised 7/15/91 Page 4 <br />