My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
835
>
2200 - Hazardous Waste Program
>
PR0220087
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 6:42:11 AM
Creation date
6/3/2020 9:23:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0220087
PE
2248
FACILITY_ID
FA0000541
FACILITY_NAME
PACIFIC COAST PRODUCERS*
STREET_NUMBER
835
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
N/A
CURRENT_STATUS
02
SITE_LOCATION
835 S STOCKTON ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2248_PR0220087_835 S STOCKTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />11 <br />MGM .9 0 <br />(Section 66262.34) <br />If an external liner, is the secondl.A <br />containment: (66265.193(e)(l)-] I <br />(A) Designed and operated to contain 100% of the <br />capacity of the largest tank within its boundary? <br />(B) Designed and operated to prevent run-on and <br />infiltration of precipitation unless it has <br />excess capacity to contain run-co� and <br />infiltration from a 25 -year, 24-hour rainfall <br />event? <br />(C) Free of cracks and gaps? <br />(D) Designed and installed to surround the tank <br />and to cover all surrounding earth likely to come <br />into Contact with the waste if released from the <br />tank? <br />If a vault system, is the secondary containment: <br />[66265.193(e) <br />(A) Designed and operated to contain 100% of the <br />capacity of the largest tank within its boundary-, <br />(B) Designed and operated to prevent run-on and <br />infiltration of precipitation unless it has <br />excess capacity to contain run-on and <br />infiltration from a 25 -year, 24-hour rainfall <br />event? <br />(C) Constructed with chemical resistant water <br />stops at any joints? <br />(D) Provided with an impermeable interior <br />coating or lining that is compatible with waste <br />in tank(s) and that will prevent migration of <br />waste into the concrete? <br />(E) Provided with ream to protect against the <br />formation of and ignition of vapors within the <br />vault if the waste is ignitable (per 66261.21) <br />or reactive (per 66261.23) and may form an <br />ignitable or explosive vapor? <br />(F) Provided with an exterior moisture barrier <br />or otherwise designed or operated to prevent <br />migration of moisture into the vault if subject <br />to hydraulic pressure? <br />Revised 7/15/91 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.