My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2300 - Underground Storage Tank Program
>
PR0231821
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:04:56 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0231821
PE
2332
FACILITY_ID
FA0004001
FACILITY_NAME
NAVAL COMMUNICATION STA*
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16203007
CURRENT_STATUS
04
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231821_305 W FYFFE_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br />Public Health Services <br />Attn: Ms. Kasey Foley <br />P. 0. Box 2009 <br />Stockton, CA 95201 <br />Dear Ms. Foley: <br />0 <br />DEPARTMENT OF THE NAVY <br />NAVAL COMMUNICATION STATION ' <br />STOCKTON <br />STOCKTON. CALIFORNIA 95203.5000 <br />3 4 <br />S <br />IN REPLY REFER TO <br />5090 ,7 1. ` -5 <br />Ser 33/ <br />2 7 OOT 1989 <br />Enclosed for your information are copies of the laboratory analysis from the <br />samples taken during the tank removals on 21 and 26 September 1989. <br />The analysis from the tank at building 803 showed no contamination. Based on <br />this, we will consider this a clean tank closure. <br />The analysis from the tank behind building 816D showed levels of total petroleum <br />hydrocarbons in both groundwater and the soil. <br />A work plan will be developed and submitted to your office and the Regional <br />Water Quality Control Board once the results from the removal of the six <br />remaining tanks on our tank removal contract has been completed. <br />Please contact Me. Rebecca O'Dell at (209) 944-0294 if you have any questions. <br />Sincerely, <br />WUZAA� <br />R. S. MOREAU <br />Lieutenant Commander, CEC, U. S. Navy <br />Public Works Officer <br />By direction of the Commanding Officer <br />Encl: <br />(1) Laboratory Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.