My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30131
>
2300 - Underground Storage Tank Program
>
PR0231737
>
COMPLIANCE INFO_1985-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2022 11:10:50 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1999
RECORD_ID
PR0231737
PE
2332
FACILITY_ID
FA0003922
FACILITY_NAME
CEMEX Construction Materials Pacific, LLC
STREET_NUMBER
30131
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
Dr
City
Tracy
Zip
95377
APN
25313011
CURRENT_STATUS
04
SITE_LOCATION
30131 S MacArthur Dr
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231737_30131 S MACARTHUR_1985-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />1.- Precision test(s) must be performed by and results submitted to this <br />office within 30 days of the test. <br />Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />P <br />GOAR`O OF TRUSTEES SAN AQUIN LOCAL HEALTH DISTRIC ` <br />SERVING <br />James Culbertson, Pros. ° <br />City of Lodi <br />Patricia E. Vannucci, Secy. 1601 East HltAP. O. B2009 <br />Anthohonelltte Van Spro Spronaen azeon venue, ox <br />San Joaquin County <br />Earl Plmentei Stockton, California 95201 <br />City of E,calon <br />City of Manteca <br />Fern Su®bee 209/466-6781 <br />Daniel L. Flores <br />City of Ripon <br />John 0. Most, M.O. <br />City of Stockton <br />City of Tracy <br />William J. Wade Jo®t Khanna, M.O., M.P.H., District Health Officer <br />San Joaquin County <br />Mary Anna Love <br />San Joaquin County <br />Facility Name pko- <br />Address 50 I— l <br />Date of Inspection Inspector <br />t <br />MONITORING ALTERNATIVE #7 <br />Limited to undernround storage tanks which have infrequent inputs and <br />withdrawals and <br />where the liquid level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />L-�Tank <br />gauging performed as follows: <br />L,"'i'a'nk must be capable of being secured to prevent unauthorized inputs and <br />wi thdrawal s. <br />Twiank <br />/ <br />1must have no inputs or withdrawals for at least a 48 <br />hour period <br />(2 days) at the end of consecutive periods lasting up to <br />7 days. <br />(For example: tank in use Monday through Friday, <br />then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and <br />end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday <br />night before <br />locking and again on Monday morning <br />before opening.) <br />t/ If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release <br />shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations <br />and further <br />evaluations shall be performed to verify or disprove the <br />variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />1.- Precision test(s) must be performed by and results submitted to this <br />office within 30 days of the test. <br />Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.