Laserfiche WebLink
r <br />1. SITE MAP ENCLOSED WITH EQUIPMENT SHOWN/SPECIFIED. YES M NO [j <br />2. DESCRIPTION OF WORK TO BE COMPLETED: <br />#1 PRODUCT LINE FROM TANK #372(UNLEADED PUMP #2) TO ABOVE GROUND OVER- <br />HEAD FILL STATION. PIPE ISO INTEGRITY TESTING ONLY. <br />#2 PRODUCT LINE FROM TANK #372(UNLEADED PUMP #1) TO LOCATE LEAK <br />DETECT VALVES AND REPAIR, INSTALL AND RELOCATE AS NEEDED. <br />PIFE ISO INTEGRITY TESTING REQUIRED. <br />#3 PRODUCT LINE FROM TANK #373(UNLEADED TO DISPENSER #2) LOCATE LEAK <br />DETECT VALVES AND REPAIR, INSTALL AND RELOCATE AS NEEDED. ALSO <br />PERFORM PIPE ISO INTEGRITY TESTING. <br />#4 INSTALL 2 INSPECTION BOXES AND NON TRAFFIC LIDS OVER AREA XaZEE <br />LEAK DETECTORS WILL BE INSTALLED. IF NEEDED. POMECO 112-24 <br />ADDITIONAL PAGES MAY BE ATTACHED. <br />3. DESCRIPTION OF EQUIPMENT TO BE USED: <br />#1 RED JACKET ADAPTOR #38-72 AND OR BIG-FLOLEAK-#116--6',7 ADAPTOR <br />BOTH OF THESE ADAPTORS CAN BE INSTALLED INTO EXISTING SYSTEMS. <br />#2 RED JACKET QLD LEAK DETECTOR MODEL #116-o(o <br />#3_POMECO 112-24 SQUARE MANHOLE FRAME AND COVER IF NEEDED <br />4. ALL EQUIPMENT IS STATE CERTIFIED OR APPROVED. YES M NO [] <br />2 <br />