My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_1991-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 2:40:48 PM
Creation date
6/3/2020 9:42:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2000
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_1991-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
637
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;r <br />IN REPLY <br />REFER TO <br />DEFENSE LOGISTICS AGENCY <br />DEFENSE DISTRIBUTION REGION WEST <br />P.O. BOX 960001 1FLL I <br />STOCKTON, CA 95296- 0710 <br />DDRW-BE (Mr. Wren/2080/lvf) <br />220CT1993 <br />SUBJECT: Inspection of Underground Storage Tanks, Defense <br />Distribution Region West (DDRW), Sharpe Facility, <br />July 21, 1993 <br />Mr. Ron Valinoti <br />Public Health Services <br />Environmental Health Division <br />San Joaquin County <br />Post Office Box 2009 <br />Stockton, CA 95201 <br />Dear Mr. Valinoti: <br />in response to the findings of your office's inspection of <br />underground storage tanks (UST) on July 21, 1993, at the DDRW <br />Sharpe Facility, the following information is provided in <br />addition to the information provided on September 24, 1993, and <br />will complete the required actions noted for building 330 and <br />building 380. <br />a. Building 380 <br />1. Product lines and leak detectors have been <br />integrity tested. Two product lines did not pass the test and <br />are in the process of being excavated to facilitate repairs if <br />required. Completion should be within 30 days. Repairs were <br />made to the leak detectors without complications. <br />2. Tanks 3 and 8 were in alarm status. It now appears <br />that the alarm system was in need of repair (see a.l. above) as <br />the integrity testing for the tanks showed that there were no <br />leaks. <br />3. Tanks 1, 3, 4, and 5 have been integrity tested <br />showing no leaks. <br />4. The Monitoring Plan's maintenance schedule has been <br />posted near the monitor. <br />b. Building 330 <br />I The Monitoring Plan's maintenance schedule has been <br />posted near the monitor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.