My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_1991-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 2:40:48 PM
Creation date
6/3/2020 9:42:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2000
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_1991-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
637
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN REPLY <br />REFER TO <br />DDRW-BE <br />0 6 <br />DEFENSE LOGISTICS AGENCY <br />DEFENSE DISTRIBUTION REGION WEST <br />STOCKTON, �A 1929 <br />c-1. 11, IS n L i PM 3: 17 <br />2 4 SEP 1993 <br />SUBJECT: Inspection of Underground Storage Tanks, Defense <br />Distribution Region West (DDRW), Sharpe Facility, <br />July 21, 1993 <br />Mr. Ron Valinoti <br />Public Health Services <br />Environmental Health Division. <br />Sar, Joaquin County <br />Post Office Box 2009 <br />Stockton, CA 95201 <br />Dear Mr. Valinoti: <br />In response to the findings of your office's inspection of <br />underground storage tanks on July 21, 1993, at DDRW Sharpe <br />Facility, the following information is provided. <br />The inspection findings were given different dates by which the <br />actions were to be completed. The actions listed herein are <br />the immediate actions and the actions due on the 1st and 15th <br />of September 1993. <br />a. Building 380 <br />1) Tank #64 - Bi -weekly tank gauging began on <br />July 23, 1993. <br />2) Tank nos. 3 and 8 - Reference the alarm status on <br />these tanks. A limited inspection was performed the following <br />day for loose or broken wires, stuck sensors, etc. We were <br />unable to detect any obvious problems. As a result, a contract <br />was issued to Banks and Company of Fresno, California for tear <br />down and repair of the alarm system, with a scheduled <br />completion date of not later than September 23, 1993. <br />b. Building 330 <br />The leak detected inside the generator facility was <br />corrected on July 21, 1993. <br />
The URL can be used to link to this page
Your browser does not support the video tag.