My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_1991-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 2:40:48 PM
Creation date
6/3/2020 9:42:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2000
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_1991-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
637
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Location <br />Owner <br />BACKFILL EXCAVATION CERTIFICATE <br />DDRW— Sharoe Facility. 700 E. Roth Rd., Lathrop, CA 95330 <br />Same as above <br />Phone No. (209)982-2427 <br />Contractor JIM THORPE OIL, INC. Phone No. (209)368-6175 License No.495699 <br />INDICATE MEiTIOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br />was placed in the excavation to 12lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter . <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofroject completion, or submission <br />of verification that the select material described above will be placed at a minimum of five (5� cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br />Code Appendix Chapter 70. <br />JIM THORPE OIL,INC. <br />ame(Print) <br />CONTRACTOR <br />lip, <br />, 1% WON <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.