My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_1991-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 2:40:48 PM
Creation date
6/3/2020 9:42:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2000
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_1991-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
637
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Modification to Three <br />DORW Sharpe Site <br />Fuel Station Underground Storage Tanks (UST's) <br />Sharpe NO. 371 375 377 <br />County No. 21 25 27 <br />Contents Diesel Diesel Diesel <br />Size (Kgals) 20 12 12 <br />Type Of Tank SW 5W SW 5W = Single Walled <br />CdthUtic Protection NO NO NO <br />Auto Dip Stick YES YES YES <br />Due to Change in leakage testing protocol, the diesel tanks described above <br />must be modified to be able to take the temperature through the personnel <br />access way. <br />R feFi I tt Ch2d, <br />Work to be performed. <br />I. R20VYe the personnel dCC2ss CUY2r. <br />2. Cut a 3" diameter hole in aCCe65 C0Y2r. <br />3. Weld a 3" x b" Steel nipple. <br />4. Install Steel Cap and Lock Set. <br />5. Re -install dCCe6S cover over new gasket, assuring it is leak tight. <br />Parts and Materials <br />Quantitj Estimated Cost <br />I. <br />3" x 0" steel nipple <br />3 <br />15.00 <br />2. <br />3" diameter Cap (steel) <br />] <br />15.00 <br />3. <br />Lock Set <br />3 <br />30,00 <br />4. <br />Access Cover Gasket <br />3 <br />15.00 <br />5. <br />Miscellaneous (coating, seals, etc.) <br />JOB <br />10.00 <br />TOTAL <br />JOB <br />89.00 <br />Labor (approximately 8 0d0hOVrS) <br />Work will be performed by Sharpe's in-house forces. <br />
The URL can be used to link to this page
Your browser does not support the video tag.