Laserfiche WebLink
r <br />Modification to Three <br />DORW Sharpe Site <br />Fuel Station Underground Storage Tanks (UST's) <br />Sharpe NO. 371 375 377 <br />County No. 21 25 27 <br />Contents Diesel Diesel Diesel <br />Size (Kgals) 20 12 12 <br />Type Of Tank SW 5W SW 5W = Single Walled <br />CdthUtic Protection NO NO NO <br />Auto Dip Stick YES YES YES <br />Due to Change in leakage testing protocol, the diesel tanks described above <br />must be modified to be able to take the temperature through the personnel <br />access way. <br />R feFi I tt Ch2d, <br />Work to be performed. <br />I. R20VYe the personnel dCC2ss CUY2r. <br />2. Cut a 3" diameter hole in aCCe65 C0Y2r. <br />3. Weld a 3" x b" Steel nipple. <br />4. Install Steel Cap and Lock Set. <br />5. Re -install dCCe6S cover over new gasket, assuring it is leak tight. <br />Parts and Materials <br />Quantitj Estimated Cost <br />I. <br />3" x 0" steel nipple <br />3 <br />15.00 <br />2. <br />3" diameter Cap (steel) <br />] <br />15.00 <br />3. <br />Lock Set <br />3 <br />30,00 <br />4. <br />Access Cover Gasket <br />3 <br />15.00 <br />5. <br />Miscellaneous (coating, seals, etc.) <br />JOB <br />10.00 <br />TOTAL <br />JOB <br />89.00 <br />Labor (approximately 8 0d0hOVrS) <br />Work will be performed by Sharpe's in-house forces. <br />