My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
11919
>
2300 - Underground Storage Tank Program
>
PR0232509
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2022 2:02:02 PM
Creation date
6/3/2020 9:43:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0232509
PE
2332
FACILITY_ID
FA0003731
FACILITY_NAME
PRECISSI FLYING SERVICE
STREET_NUMBER
11919
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05902047
CURRENT_STATUS
04
SITE_LOCATION
11919 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0232509_11919 N LOWER SACRAMENTO_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION RECORD <br /> FACILITY NAME ��ELI56 I 1—I rel 11J(r f��V(CE I <br /> FACILITY ADDRESS h'1 l O� K • L n e-r (k, ra ory rY1T� <br /> SWEEPS # TANK# O Z U.L. # PRODUCT M GA S <br /> DATE APPROVED DISAPPROVED REFIS ITEM OR EQUIPMENT INSPECTED <br /> 1. UST INSTALLATION PLANS SUBMITTED & FEES PAID <br /> 2 Ci ✓ 2. UST INSTALLATION PLANS APPROVED <br /> IN17I7AL INSPECTION <br /> 3 8 q 1. HOLIDAY TEST (PLASTEEL) <br /> 2. AIR TESTED @ 5 PSI (FRP) <br /> 3 G�� 3. VISUAL INSPECTION OF 20 CONTAINMENT <br /> aJ �j 4. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br /> PIPING STAGE INSPECTION <br /> I. PRESSURE TEST (10 AND 20 PSI (FRP)] <br /> 4 1 1 I 1 vl 2. BALL FLOAT VALVES INSTALLED <br /> 3. OVERFILL PROTECTION INSTALLED, DESCRIBE: �71c✓kP <br /> 4. UNUSED TANK OPENING SEALED & CATHODICALLY PROTECTED <br /> c� 1 <br /> S. VISUAL INSPECTION OF 20 CONTAINMENT ON PIPING <br /> 6. MONITORING PORTS IN PLACE & BROUGHT TO GRADE (LOCKABLE <br /> �— WEATHER PROOF COVERS) <br /> �� ✓ 7. FILL &VENT PIPING BROUGHT TO GRADE <br /> 8. PRODUCT LINE LEAK DETECTOR INPLACE (HARD WIRED) <br /> 9. APPROVED UST LEAK MONITORING DEVICE INSTALLED <br /> 3/2.9 V1 10.ALL GALVANIZED PIPING & FITTINGS PROPERLY WRAPPED <br /> 11. PRESSURE DECAY TEST ON COMPLETE UST & PRODUCT DELIVERY <br /> V SYSTEM <br /> FINAL INSPECTION <br /> U13,1 ( 1. PRECISION TEST SUCCESSFULLY COMPLETED AND HARD COPIES <br /> 4 <br /> 4 j lqj V K 2. SPILL PROTECTION AT FILL PIPE <br /> 3. PERFORMANCE TEST OF OVERFILL PROTECTION SYSTEM <br /> 4. PERFORMANCE TEST OF PRODUCT LINE LEAK DETECTOR (HARD <br /> N ft WIRED) <br /> �S-)� PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM(S) ON <br /> -1 I TANK(S) <br /> } I 6. PERMIT TO OPERATE APPLICATION COMPLETE <br /> IH 23 066 (REV( l Gl( 7. ACCEPTABLE RECORD KEEPING SYSTEM <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.