Laserfiche WebLink
13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic. 1 <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - <br /> 40,000 volts). [Section 2635 (b) (4)] <br /> C. Fiberg Sections 2635 (3) and 2631 (p)] <br /> (1) Str late dimensions and materials. <br /> (2) Striker plate un all accessible openings. <br /> (3) Installation instructions req an air test and soap <br /> test prior to installation. <br /> D. Non-clad s el tank [Section 2635 (b)] <br /> (1) Ca is protection provided for entire tank, piping and <br /> compo s (nuts, bolts, washers, etc.). <br /> (2) Approved by corrosion engineer or N.A.C.E. <br /> technician. <br /> (3) Document stating inspects ethod and frequency <br /> (minimum semi-annual inspectio quirement). <br /> E. Other types of tanks. <br /> (1) Chemic\abstrac <br /> f material stored is provided. <br /> (2) Chemice number(CAS#) <br /> 14. Overflow protection systems (detail drawing of spill catchment basins)/piping <br /> sump(s) required, including tank fill and all openings). [Section 2635 (b)'(8)] <br /> A. Spill catchment basin. <br /> Capacity: <br /> Type: <br /> 5 <br />