Laserfiche WebLink
Describe the method that will be utilized to purge and/or inert the tank(s): <br /> b. Tank/Piping Hauler: <br /> Name_ <br /> Address <br /> r` cizip=00V -,If <br /> Phone.No. � <br /> Hauler Registration# (if hauled as has:_rdous) <br /> C. Tank/Piping Disposal Site:: <br /> Name C.> <br /> e� City uZip <br /> Address / <br /> Phone No. <br /> EPA ID# (if transported to a permitted' 'D facility) <br /> 9. Is the sampling firm an independent third pax- from the contractor? YES NO [] <br /> 9a. Describe,in d tail,how the soil and/or water sa ole(s)beneath the tank and piping will be obtained: <br /> C � <br /> 10. Describe how the excavation will be backfilled`= h suitable material upon removal: <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank I and cover the stockpile? <br /> b)What will be the final destination of the excE sated stockpile? <br /> c)Contaminated Soil Hazardous Waste Hauler <br /> Hauler Registration# � <br /> Name <br /> Address <br /> City <br /> f Zip S 2— <br /> Phone No. 2C 7-J <br /> EH 23 046(Revised 3/15/02) Page 5 <br />