Laserfiche WebLink
D. Results of Testing/Servicing , <br /> Software Version Installed: <br /> Co to the following checklist: <br /> Yg& ❑ No* Is the audible alarm operational? <br /> ❑ No* Is the visual alarm operational? <br /> ca ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> es ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> Q-IWAK operational? <br /> ❑ Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> /A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that ulilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> /A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? if so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* o Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* U-N& Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> ❑ Yes Cl IVo* Was monitoring system set-up reviewed to ensure pro2er settings?Attach set uR re orts,if apjRlicable <br /> Yes ❑ No* Is all monitoring a ui mentoperational Eer manufacturer's s ecifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: A^ IQr tja �-w L(S 44 <br /> Page 2 of 3 03/01 <br />