My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_1986-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 1:21:59 PM
Creation date
6/3/2020 9:43:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1995
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_1986-1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECOVERY <br />SITE PREPARATION <br />❑ PLUGS, RISERS,—,/❑ OTHER <br />❑ NO PREPARATION 2 OPEN TO ATMOSPHERE <br />❑ P•V VALUE REMOVED <br />❑ OTHER <br />REMOTE/SUBMERSIBLE (DEPTH ) <br />❑ SUCTION (HEIGHT 1 <br />CHECK VALVE <br />STRAINER <br />IMPACT VALVE <br />CHECK VALVE <br />STRAINER <br />S <br />Page `5 <br />. <br />SITE PREPARATION <br />AND SYSTEM DATA <br />❑ BURIED <br />❑ REMOVED <br />THREE -TANK SYSTEM <br />PLACE <br />1� 1N PLACE <br />L <br />3"'! <br />❑ IN PLACE <br />CUSTOMER: <br />c� <br />DATE: <br />OUT <br />LOCATION NO.: <br />Z d�- 7S Z 3Q <br />SYSTEM NO.: <br />&.COVER <br />`- <br />'.vG Kid/�/� <br />5% <br />Z� n. D: <br />❑ OPEN NO FOIL <br />STATE: <br />CITY/S <br />.❑ OTHER <br />PRODUCT: <br />TANK 2 <br />OTHER <br />_ l-%=��C" <br />ECOVERY <br />SITE PREPARATION <br />❑ PLUGS, RISERS,—,/❑ OTHER <br />❑ NO PREPARATION 2 OPEN TO ATMOSPHERE <br />❑ P•V VALUE REMOVED <br />❑ OTHER <br />REMOTE/SUBMERSIBLE (DEPTH ) <br />❑ SUCTION (HEIGHT 1 <br />CHECK VALVE <br />STRAINER <br />IMPACT VALVE <br />CHECK VALVE <br />STRAINER <br />SUCTI CONNECTION <br />❑ REMOVED & OPEN <br />❑ REMOVED <br />❑ CLOSED : <br />❑ BURIED <br />❑ REMOVED <br />❑ UNION' <br />PLACE <br />1� 1N PLACE <br />❑ PLUS <br />❑ EXTRACTABLE <br />❑ IN PLACE <br />❑ COUPLING <br />IN <br />❑CLOSED <br />❑ REPLACED &COVER <br />OUT <br />❑ REMOVED <br />❑ RE ED & COVER <br />LACED <br />❑ OPEN WITH FOIL <br />&.COVER <br />SYSTEM CAPACITY, <br />❑ IN PLACE <br />Z� n. D: <br />❑ OPEN NO FOIL <br />® REMOVED <br />REPLACED <br />.❑ OTHER <br />TANK 1 <br />TANK 2 <br />OTHER <br />_ l-%=��C" <br />TC <br />`- = <br />A ° F <br />REMOVED & <br />❑ IN PLACE <br />❑ OTHER <br />CAPREP <br />REPLA D <br />f Temp. Differential <br />- <br />- <br />EI <br />❑ OT <br />OTHER <br />i <br />T Time of Temp. <br />TEST 1 DATA <br />CALIBRATION <br />TANK 1 ; <br />TANK 2 <br />TANK 3 <br />LOCATION <br />DROP TUBE <br />LOCATION DROP TUBE <br />LOCAT <br />DROP TUBE <br />FILL <br />Gauge <br />Other (Specify) <br />IN <br />OUT <br />None <br />FILL Gauge <br />Other (Specify) IN <br />OUT N <br />L <br />Gauge <br />Other (Specify) <br />IN <br />OUT <br />None <br />T. PROBE <br />SYSTEM CAPACITY, <br />AVG. CC'S/DIV- C, 7e) Y <br />Z� n. D: <br />GT <br />TANK 1 <br />TANK 2 <br />TANK e <br />_ l-%=��C" <br />TC <br />`- = <br />A ° F <br />BALANCE <br />Ao F <br />f Temp. Differential <br />i <br />CALIBRATION <br />COEFFICIENT OF EXPANSION 1/ Ff" <br />o <br />LOCATION/ <br />METHOD <br />e SOLID ROD <br />'❑ LIQUID <br />.TEMPERATURE, F. ' <br />1 <br />2 <br />3 <br />5 <br />6/ <br />AV�'RAGE <br />CO'S <br />1 ®U <br />�— ��0^U <br />.-4" ®0 <br />r4 <br />"� 6 CiC� <br />�— j/0061 <br />1:1El7 <br />C <br />A DIVISION <br />// Z6// <br />TC , 3 <br />TANK 1 TANK 2. <br />SYSTEM CAPACITY, <br />AVG. CC'S/DIV- C, 7e) Y <br />Z� n. D: <br />LEAK RATE LR 'CALCULATION <br />LR = <br />±A DIVISIONS X CALIBRATION, CC = CC IN OUT <br />MINUTE DIVISION MINUTE <br />LR= <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />COEFFICIENT OF EXPANSION 1/ Ff" <br />o <br />3785 GT CE �oF CC IN OV.I. <br />GRAVITY <br />.TEMPERATURE, F. ' <br />TC = - OR <br />� MINUTE <br />TIME <br />SOURCE ❑ T159C <br />_ <br />❑ A <br />❑ D ❑ CHART <br />❑ B <br />❑ E ❑ PUBLISHED DATA AT 60OF <br />1:1El7 <br />C <br />OTHER <br />// Z6// <br />TC , 3 <br />TANK 1 TANK 2. <br />SYSTEM CAPACITY, <br />GALLONS <br />Z� n. D: <br />GT <br />TANK 1 <br />TANK 2 <br />TANK e <br />_ l-%=��C" <br />TC <br />`- = <br />A ° F <br />`/ <br />Ao F <br />f Temp. Differential <br />T Time of Temp. <br />® <br />A Time <br />Differential, Min. <br />ABSOLUTE LEAK RATE (ALR) CALCULATION <br />_„ !'Zf ZYU <br />_ Q <br />— �' 3 Z' 411Y <br />i <br />ABSOLUTE LEAK RATE <br />LEAK RATE <br />TEMP. COMPENSATION CC/MIN -. <br />_ <br />X <br />CC/MIN <br />0.015852 <br />GAL/HO ;gtt <br />�❑ IF ALR i '� <br />0.05 GPH, A CHECK TEST WAS CONDUCTED WHICH <br />CONFIRMS THE ABOVE RESULTS C . L` I� C T) <br />R, <br />❑ A CHECK TEST <br />WAS NOT CONDUCTED. <br />a..- <br />* 60 MINUTES/HOUR T 3785CC/GALLON = 0.015852 APS <br />31989 <br />
The URL can be used to link to this page
Your browser does not support the video tag.