Laserfiche WebLink
ADDITIONAL TESTS _ APage 3A <br />CUSTOMER: 0 <br />SINGLE TANK SYSTEM _DATE: '"Gj <br />LOCATION NO: TEST 2 DATA PRODUCT: cJ <br />Conditions and site preparation during this test are the same as Test 1 Yes ❑ No, <br />Explain. <br />GALWHATION <br />LOCATION .�� / 1 <br />TIME <br />LEVEL <br />SOLID ROD - LIQUID- <br />LOCATION <br />DROP TUBE . <br />FILL <br />GAUGE <br />OTHER (SPeclfy) <br />IN <br />OUT <br />NONE <br />START <br />TEMP. PROBE <br />ENDL <br />r7„ <br />BALANCE <br />GALWHATION <br />LOCATION .�� / 1 <br />METHOD <br />❑ <br />SOLID ROD - LIQUID- <br />2 . 3 4._...,... ...5.-. 6 <br />AVERAGE <br />CC's ADDED (+) OR REMOVED (-) <br />CI <br />DIVISIONS <br />% <br />c... <br />S, 3 <br />LEAK RATE LR CALCULATION <br />A DIVISIONS CC CC <br />LR MINUTE <br />X CALIBRATION, DIVISION - MINUTE IN..•,- OR OUT _ <br />LR = <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />SYSTEM CAPACITY, GALLONS <br />A eF 4fQ18 ±TEMPS:., ­_ DIFFERENTIAL,eF <br />ATIME - TIME OF TEMP. DIFFERENTIAL, MINUTES <br />CE I COEFFICIENT OF EXPANSION 1/°F <br />GRAVITY TEMPERATURE, F <br />ABSOLUTE LEAK RATE (ALR) CALCULATION <br />- ABSOLUTE LEAK RATE= *Elm/q s4-7100 <br />LEAK RATE TEMP. COMPENSATION CC/MIN <br />X 0.015852 <br />CC/MIN. GAL/HOUR <br />❑ IFA I LIq->± 0.05 GPH, A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS (CALCULATIONS ON CHART) --- <br />❑ A CHECK TEST WAS NOT CONDUCTED <br />TEST 3 DATA <br />CONDITIONS AND SITE PREPARATION DURING THIS TEST ARE THE SAME AS TEST 1 ❑ Yes ❑ No <br />EXPLAIN: <br />LOCATION DROP TUBE <br />TIME LEVEL <br />• FILL !GAUGE OTHER (SPeclfy) IN OUT NONE <br />START TEMP. PROBE <br />END, BALANCE <br />CALIBRATION <br />LOCATION METHOD <br />❑: SOLID ROD ❑ LIQUID <br />1 2 3 4 5 6 AVERAGE <br />CC's ADDED OR REMOVED <br />DIVISIONS <br />AVERAGE CC'S PER DIVISION <br />LEAK RATE (LR) CALCULATION <br />± Q DIVISIONS <br />LR.= X CALIBRATION, CC = CC IN OUT <br />MINUTE DIVISION MINUTE + OR <br />i •3 C--3 <br />LR <br />TEMPERATURE COMPENSATION (TC) CALCULATION <br />GT SYSTEM CAPACITY, GALLONS <br />o TC- 3785 G -t CE F CC IN OUT <br />F ±TEMPERATURE DIFFERENTIAL,eF ATIME MINUTE (+) OR ( i <br />_ATIME TIME OF TEMP. DIFFERENTIAL, MINUTES ti � r 3 <br />uwtii <br />CE COEFFICIENT OF EXPANSION 1/ eF TC <br />" +6 <br />GRAVITY TEMPERATURE, F r, t <br />ABSOLUTE LEAK RATE (ALR) CALCULATION <br />ABSOLUTE LEAK RATE _ — . I fit) �JIT <br />LEAK RATE TEMP.CAMPENSATION CC/MIN F���/B` 5 F+ /SeRvICIST <br />= X , 0.015852 <br />CC/MIN = GAL/HOUR <br />❑ IF ALR > ± 0.05 GPH, A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS (CALCULATIO(VS ON CHART) <br />❑ A CHECK TEST WAS NOT CONDUCTED - <br />