My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:09:10 PM
Creation date
6/3/2020 9:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2004
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_1995-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
< phi NiJUILKeyPersonnel <br /> Title/Name and Responsibilities Name Phone Number <br /> GENERAL CONTRACTOR <br /> Wayne Perry, Inc. Brandon Smith (916) 834-5717 <br /> ENVIRONMENTAL CONTRACTOR <br /> Wayne Perry, Inc. Jason Smith (916) 834-5712 <br /> Jason Smith / (916) 834-5712 <br /> SENIOR SAFETY OFFICER Robert Hays (714) 826-0352 <br /> WPI <br /> SITE SAFETY OFFICER Foreman - WPI <br /> CLIENT Perry Pineda (925) 957-0203 <br /> E uiva Services LLC <br /> GENERAL CONTRACTOR <br /> The general contractor is responsible for conducting excavation, over-excavation, <br /> tank removal, grading and other construction activities at the site. The general <br /> contractor is also responsible for health and safety of its subcontractors while they <br /> are on site. <br /> ENVIRONMENTAL CONTRACTOR <br /> The environmental contractor is responsible for collection of samples, <br /> characterization and segregation of impacted soil and groundwater generated during <br /> tank removal activities, air monitoring in accordance with Rule 1166, and required <br /> health and safety monitoring. <br /> SITE SAFETY OFFICER <br /> The Site Safety Officer has the authority to upgrade or downgrade the provisions of <br /> this Site Safety Plan as site conditions change. In addition, the Site Safety Officer <br /> shall be responsible for the following: <br /> • Safety supplies and equipment inventory for the project site <br /> • Accident/incident reporting <br /> • Decontamination/contamination reduction procedures <br /> • Ensuring site personnel adhere to guidelines in this SSHP <br />
The URL can be used to link to this page
Your browser does not support the video tag.