Laserfiche WebLink
0 <br />0 SHELL LEAK RESPONSE PLAN <br />IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES FOR USE BY THE SHELL <br />OIL COMPANY FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH MAY OCCUR AT SHELL FACILITIES. DESIGN <br />AND INSTALLATION IMPROVEMENTS ARE CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER TO <br />REDUCE, AND ELIMINATE, THE POTENTIAL FOR PRODUCT LEAKAGE. <br />RESPONSIBLE SHELL PERSONNEL <br />NAME <br />TITLE <br />PHONE <br />Steve Griffen <br />Manager <br />Day 209-948-0574 <br />24hr 209-957-5461 <br />Jeff Granberry <br />Project Engineer <br />Work 510-675-6145 <br />Home 510-673-0753 <br />Jeff Byram <br />District Engineer <br />Work 510-675-6146 <br />Home 510-674-9413 <br />Dan T. Kirk <br />Environmental Engineer <br />Work 510-675-6168 <br />Home 510-283-8573 <br />O C, <br />SERVICE STATION SYSTEMS, INC 800-887-8009 24 HOURS <br />1236 NORTH STH STREET <br />SAN JOSE, CA 95112 <br />LEAK VERIFICATION <br />WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING LEAK VERIFICATION <br />PROCEDURES WILL APPLY: <br />1. THE SHELL ENGINEER WILL ARRANGE FOR THE SHELL TERRITORY MANAGER TO IMMEDIATELY (THE <br />SAME DAY) VISIT THE STATION TO REVIEW THE DEALER'S PHYSICAL CONTROL OF PRODUCTS AND <br />INVENTORY RECORDS. <br />2. AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION, ASSURE METERS <br />ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, AND CHECK LEAK DETECTOR <br />OPERATION (ON REMOTE SYSTEMS). <br />3. ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS A RECORD OF <br />SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br />4. IF THE ABOVE INVESTIGATIONS PROVE INCONCLUSIVE, THE TERRITORY MANAGER SHOULD <br />IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B), WHICH WOULD BE MAINTAINED FOR A <br />MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, FOR SUBSTANTIATION OF A SUSPECTED <br />LEAK. DEPENDING ON THE CIRCUMSTANCES (POTENTIAL HAZARDOUS CONDITION, ETC.), IT MAY BE <br />NECESSARY TO TAKE ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br />5. IF PRODUCT LOSSES ARE VERIFIED, PRODUCT LINES AND/OR TANKS MAY REQUIRE TESTING TO <br />DETERMINE THE LEAK SOURCE. <br />10 <br />