My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:09:10 PM
Creation date
6/3/2020 9:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2004
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_1995-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 SHELL LEAK RESPONSE PLAN <br />IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES FOR USE BY THE SHELL <br />OIL COMPANY FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH MAY OCCUR AT SHELL FACILITIES. DESIGN <br />AND INSTALLATION IMPROVEMENTS ARE CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER TO <br />REDUCE, AND ELIMINATE, THE POTENTIAL FOR PRODUCT LEAKAGE. <br />RESPONSIBLE SHELL PERSONNEL <br />NAME <br />TITLE <br />PHONE <br />Steve Griffen <br />Manager <br />Day 209-948-0574 <br />24hr 209-957-5461 <br />Jeff Granberry <br />Project Engineer <br />Work 510-675-6145 <br />Home 510-673-0753 <br />Jeff Byram <br />District Engineer <br />Work 510-675-6146 <br />Home 510-674-9413 <br />Dan T. Kirk <br />Environmental Engineer <br />Work 510-675-6168 <br />Home 510-283-8573 <br />O C, <br />SERVICE STATION SYSTEMS, INC 800-887-8009 24 HOURS <br />1236 NORTH STH STREET <br />SAN JOSE, CA 95112 <br />LEAK VERIFICATION <br />WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING LEAK VERIFICATION <br />PROCEDURES WILL APPLY: <br />1. THE SHELL ENGINEER WILL ARRANGE FOR THE SHELL TERRITORY MANAGER TO IMMEDIATELY (THE <br />SAME DAY) VISIT THE STATION TO REVIEW THE DEALER'S PHYSICAL CONTROL OF PRODUCTS AND <br />INVENTORY RECORDS. <br />2. AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION, ASSURE METERS <br />ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, AND CHECK LEAK DETECTOR <br />OPERATION (ON REMOTE SYSTEMS). <br />3. ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS A RECORD OF <br />SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br />4. IF THE ABOVE INVESTIGATIONS PROVE INCONCLUSIVE, THE TERRITORY MANAGER SHOULD <br />IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B), WHICH WOULD BE MAINTAINED FOR A <br />MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, FOR SUBSTANTIATION OF A SUSPECTED <br />LEAK. DEPENDING ON THE CIRCUMSTANCES (POTENTIAL HAZARDOUS CONDITION, ETC.), IT MAY BE <br />NECESSARY TO TAKE ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br />5. IF PRODUCT LOSSES ARE VERIFIED, PRODUCT LINES AND/OR TANKS MAY REQUIRE TESTING TO <br />DETERMINE THE LEAK SOURCE. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.