My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:09:10 PM
Creation date
6/3/2020 9:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2004
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_1995-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />A S ENGINEERING INC. <br />PLANNING • ENGINEERING • CONSTRUCTION MANAGEMENT <br />45 QUAIL COURT, STE. 303, WALNUT CREEK, CA. 94596 • PHONE: 510-933-0578 • FAX 510-933-0588 <br />4. COMMENT - Specify the role of Beaudreau Model 406 pump cut-off in the monitoring <br />system. Submit the drawing and literature on how it is wired and how it <br />will meet Title 23 Section 2636 (g). <br />RESPONSE - <br />The Beaudreau equipment will not be used at this site. We were informed <br />on other projects in your district that is not approved. The brochures were <br />submitted by mistake for this project. <br />5. COMMENT - <br />Specify which overfill prevention valves will be installed. <br />RESPONSE - <br />The overfill prevention valve to be used is the OPW #61 SO -4100 (see <br />attached brochure cut -sheet). <br />6. COMMENT - <br />Specify which flex -catch will be installed. Application indicates 15 gallon <br />EBW, the brochure indicates 5 gallon EBW with no drain and not listed by <br />EBW. <br />RESPONSE - <br />The EBW #705-458-01 (5) gallon manhole is to be used for the vapor & the <br />EBW #715-456-01 (15) gallon manhole is to be used for the fills. Please see <br />attached brochures. <br />7. COMMENT - <br />Provide the proposed location of the monitoring panel. <br />RESPONSE - <br />The monitoring panel is to be located next to the existing electrical panel <br />that is adjacent to the dealer's office. <br />8. COMMENT - <br />Provide information on how complete pump shut down is achieved when <br />the monitoring system failed or the alarm is activated. <br />RESPONSE - <br />When Iiquid is detected in the dispenser containment box or the turbine <br />containment rod, power to the sub -pumps is cut-off and can only be <br />restored by an authorized service technician who determines the root of the <br />problem. <br />Please review these corrections as soon as possible. Feel free to call me at (510) 933-0578 if <br />you have any questions or comments. <br />Sincerely,-Yours11-2 <br />, <br />Vince Padilla <br />General Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.