My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:09:10 PM
Creation date
6/3/2020 9:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2004
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_1995-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y • • <br />YCMY�T TfY1 <br />`+PIPING INFORMATION <br />TAaN�K## <br />TANK# TANK# <br />DISTANCE from <br />DISPENSER to TANK <br />\T,ANNK## <br />D <br />v pff—I � v� �{�gi e3 <br />�f ' Ot Cllr" 0 <br />1 MANUFACTURER <br />A,D, S <br />SYSTEM TYPE * <br />rliazUp-1:55 __-- <br />V <br />CONSTRUCTION **' <br />MATERIAL *** <br />LEAK DETECTION SYSTEM <br />100% METHANOL COMPATIBILITY with <br />FRP <br />CORROSION PROTECTION <br />* System Type; suction, pressure, and gravity <br />** Construction: single -walled, double -vatted, lined -trench, etc. <br />*** Material Type; steel -iron, stainless-steel, fiberglass, etc. <br />26. Piping (cross-sectional diagram, including corrections to tank and dispensers). <br />Double wall piping or _ Secondary containment (Trench liner, etc.) <br />(1) Product line (leak detector or automatic shut-off on <br />pressurized piping). <br />_ (2) Vent and vapor recovery lines if not designed to <br />prevent the entrance of standing fluids. (Ball float valve) <br />_ (3) Manways and other single walled pipe fittings on a <br />double -walled tank, if not designed to prevent the <br />entrame of standing fluid. <br />27. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />28, >< Plan review and operating permit fees paid. <br />29. 2SD Monitoring and Response Plans submitted. <br />30. Proof of financial responsibility on file. <br />31. What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitori well data, water <br />studies, etc.) IT7 i _YJ ct G <br />32. Total number of tanks on site after installation: <br />33. Any existing tanks to be removed or abandoned? YES } NO C ) If yes, submit State Water Resources <br />Control Board "Facility Permit (B)" application form. <br />34. Responsible party(ies) shall submit a "Letter of Commitment` prior to the <br />installation of new tanks. (Applies to sites with documented soil and/or groundwater contamination) <br />35. County/City Fire District and Building Department notified. <br />36. REMARKS <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.