Laserfiche WebLink
Note: Enhanced Leak Detection (ELD) must be performed prior to the final inspection. A <br /> separate permit application is required to install ELD. <br /> 2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION <br /> E] Complete to scale As-Built Plans <br /> E] Complete Monitoring and Response Plan <br /> El UPCF Underground Storage Tanks - Installation Certificate of Compliance (one form per <br /> tank) <br /> E] Completed Underground Storage Tank Certification of Financial Responsibility form along <br /> with any required attachments <br /> E] Passing Line Leak Detector Test Results <br /> Ej Passing Line Tightness Test Results(Required if the UST s%-stem does not satis&the <br /> California Code of Regulations 2636(8)for automatic pump shut-off.) <br /> Ej Passing Enhanced Leak Detection Results <br /> D. INSPECTIONS: <br /> Note: A representative from the San Joaquin County Environmental Health Department <br /> must witness all activities described below. <br /> El Tank holiday test (for fiberglass-coated steel tanks) performed prior to installation in <br /> excavation <br /> Inspection of tank vacuum gauge(if applicable)prior to placement in excavation <br /> E] Tank soap test(for fiberglass tanks)performed prior to installation in excavation <br /> E] Verification of tank set and anchorage in excavation <br /> El Primary piping including product piping, vapor recovery and vent line piping soap and <br /> pressure test <br /> Secondary piping including product piping, vapor recovery and vent line piping soap and <br /> pressure test <br /> El 24-Hour secondary containment lake test on sumps and under-dispenser containment <br /> n Visual inspection of piping to ensure proper slope prior to covering <br /> El Overfill performance test <br /> El Prior to receiving fuel, a complete functional test of tank and piping monitoring system(s) <br /> including overfill prevention <br /> El Final inspection and demonstration of automatic shut down(if applicable). <br /> -5 - <br />