Laserfiche WebLink
modem Modern Welding Company, Inc. modern <br /> www.modweldeo.com <br /> Installation Instructions - Glasteel II Jacketed Steel Tanks <br /> INTRODUCTION A)Non-metallic piping,or <br /> 1.0 Proper installation is essential to the expected product B)Conductive piping must be isolated from <br /> life and performance on Modern's Glasteel II the backfill material and any other metal <br /> Underground Storage Tank.This tank must be or grounding device. <br /> installed in accordance with these installation TESTING <br /> instructions,the latest issue of N.F.P.A. 30 and 31 5.0 Glasteel II tanks are shipped with a vacuum on <br /> pamphlet,the PEI/RP-100 and local authorities the annular space.If a minimum of 5.3 inches <br /> having jurisdiction over underground tank installations Hg of vacuum is maintained for one hour,both the <br /> and codes. inner tanks and outer tank may be considered <br /> 1.1 Although the instructions are clear and precise, properly tested.Fluctuations in interstice vacuum <br /> unexpected conditions often occur and thus are caused by temperature and barometric <br /> prudent thought,coupled with extreme care pressure changes. <br /> become the proper procedure. NOTE:NFPA 30: 2-8.3.4 Secondary containment <br /> TANK HANDLING tanks shall have the interstitial(annulus)space <br /> 2.0 Extreme caution shall be used when handling the tested using vacuum at 5.3 in-Hg. The vacuum <br /> tank.Do not drop or roll the tank. shall be held for one hour. Care shall be taken <br /> 2.1 Equipment to lift and lower the tank shall be of to ensure that the interstitial space is not <br /> sufficient capacity to do so without dragging or subjected to excessive vacuum. <br /> dropping the tank. NFPA 30: 2-8.4: "Before the tank is initially <br /> PP g p <br /> 2.2 The tank shall be lifted and lowered using the laced in service,all leaks or deformations shall <br /> lifting lugs or lifting plugs provided. Cables or be corrected in an acceptable manner." <br /> chains used shall be of adequate length. No CAUTION: Do Not Apply Air Pressure to tank's annular <br /> circumstances warrant the use of chains or slings space. <br /> around the tank shell.Maximum angle of the EXCAVATION AND BEDDING <br /> sling shall be 60 degrees. 6.0 Glasteel II underground storage tanks are designed to <br /> TANK STORAGE withstand a maximum burial depth of 60".If a greater <br /> 3.0 If tank is stored on site prior to installation, a burial depth is required,contact the manufacturer. <br /> secure area shall be chosen. Special attention 6.1 The excavation shall be properly accomplished <br /> shall be placed in selecting the storage location to and free from any material or object that would <br /> assure the absence of rocks and foreign objects cause damage to the tank exterior. <br /> that might cause damage to the tank exterior. 6.2 The bottom of the excavation shall be suitably <br /> graded and leveled.The foundation for the tank <br /> shall be a minimum of 6 inches of clean,inert, <br /> o compacted sand,or 6 inches of pea gravel,the <br /> largest particle of which does not exceed 3/4 inch, <br /> or rounded-edge gravel crushings, angular <br /> particle size required to be not less than 1/8" <br /> or more than 1/2".See chart in"Backfill Section" <br /> 6.3 There shall be a minimum of 12 inches from the <br /> outside edge of the tank to the inside edge of the <br /> excavation.This distance shall remain true for <br /> the entire perimeter surrounding the tank. <br /> INSPECTION Multiple tank installation will also require a <br /> 4.0 Visually inspect the tank exterior for damage. minimum of 12 inches between tanks measured from <br /> Any extreme gouging or abrasion should be carefully each outside edge. <br /> reviewed and appropriate action taken. <br /> 4.1 Remove thread protectors and shipping plugs REMOVE LARGE OR SHARP ROC <br /> from all openings(except vacuum gage location). FROM EXCAVATION <br /> Using compatible,non-hardening pipe sealant, MINIMUM 12• <br /> install permanent metal plugs in all unused <br /> openings. , <br /> 4.2 Refer to Modern Welding Company's publication, � � ,. .; U <br /> " <br /> "Finishing Instructions"for proper installation of SLOPE AS „as , <br /> DETERMINED }', <br /> permanent coverings for unused openings and BY SOIL TYPE GLASTEEL l <br /> « <br /> lifting lugs. '^� 1s g• ..` aa•- <br /> �G <br /> 4.3 For Glasteel II tanks fabricated withoutW. <br /> e ` <br /> dielectric isolation, (threaded nylon bushings or ' ," hr, CLEAN INERT SAND <br /> flange isolation kits)this tank must use either: .'.c��,{� I.. r. GRAVEL I <br />