My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2004-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:30:02 PM
Creation date
6/3/2020 9:43:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2005
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2004-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G"'gymModert Welding CompanAnc. modem <br /> www.modweldco.com <br /> Installation Instructions - Glasteel Il Jacketed Steel Tanks <br /> INTRODUCTION A)Non-metallic piping,or <br /> 1.0 Proper installation is essential to the expected product B)Conductive piping must,be isolated from <br /> life and performance on Modern's Glasteel 11 the backfill material and any other metal <br /> Underground Storage Tank.This tank must be or grounding device. <br /> installed in accordance with these,installation TESTING <br /> instructions,the latest issue of N.F.P.A.30 and 31 5.0 Glasteel II tanks are,shipped with a vacuum on <br /> pamphlet,the PRI/RP-100 and local authorities the annular space.If a minimum of 5.3 inches <br /> having jurisdiction over underground tank installations Hg of vacuum is maintained for one hour,both the <br /> and codes. inner tanks and outer tank may be considered <br /> 1.1 Although the instructions are clear and precise, properly tested.Fluctuations in interstice vacuum <br /> unexpected conditions often occur and thus are caused by temperature and barometric <br /> prudent thought,coupled with extreme care pressure changes. <br /> become the proper procedure. NOTE:NFPA 30:2-8.3.4 Secondary containment <br /> TANK HANDLING tanks shall have the interstitial(annulus)space, <br /> 2.0 Extreme caution shall be used when handling the tested using vacuum at 5.3 in-Hg. The vacuum <br /> tank.Do not drop or roll the tank. shall be held for one hour. Care shall be taken <br /> 2.1 Equipment to lift and lower the tank shall be of to ensure that the interstitial space is not. <br /> sufficient capacity to do so without dragging or subjected to excessive vacuum. <br /> dropping the tank. NFPA 30:2-8.4: "Before the tank is initially <br /> 2.2 The tank shall be lifted and lowered using the placed in service, all leaks or deformations shall <br /> lifting lugs or lifting plugs provided. Cables or be corrected in an acceptable manner." <br /> chains used shall be of adequate length. No CAUTION: Do Not, Apply Air Pressure to tanks annular <br /> circumstances warrant the use of chains or slings space. EXCAVATION AND BEDDING <br /> around the tank shell.Maximum angle of the <br /> sling shall be 60 degrees. 6.0 Glasteel 11 underground storage tanks are designed to <br /> TANK STORAGE withstand a maximum burial depth of 60".If a greater <br /> 3.0 If tank is stored on site prior to installation, a burial depth is required,contact the manufacturer. <br /> secure area shall be chosen.Special attention 6.1 The excavation shall be properly accomplished <br /> shall be placed in selecting the storage location to and free from any material or object,that would <br /> assure,the absence of rocks and foreign objects cause damage,to the tank exterior. <br /> that might cause damage to the tank exterior. 6.2 The bottom of the excavation shall be suitably <br /> graded and leveled.The foundation for the tank <br /> shall be a minimum of 6 inches of clean, inert, <br /> compacted sand,or 6 inches of pea gravel, the <br /> largest,particle of which does not exceed 3/4 inch, <br /> or rounded-edge gravel crushings, angular <br /> particle size required to be not less than 1/8" <br /> or more than 1/2".See chart in"Backfill Section" <br /> 6.3 There shall be a minimum of 12 inches from the <br /> outside edge of the tank to the inside edge of the <br /> excavation.This distance-hall remain true for <br /> the entire perimeter surrounding the tank. <br /> INSPECTION Multiple tank installation will also require a <br /> 4.0 Visually inspect the tank exterior for damage. minimum of 12 inches between tanks measured from <br /> Any extreme gouging or abrasion should be carefully each outside edge. <br /> reviewed and appropriate action taken. <br /> 4.1 Remove thread protectors and shipping plugs REMOVE LARGE OR SHARP RGC1 <br /> from all openings(except vacuum gage location). FROM EXCAVATION <br /> Using compatible.,non-hardening pipe sealant, NNIMILIM 12" <br /> install permanent metal plugs in all unused <br /> openings. <br /> 4.2 Refer to Modem Welding Company's publication, <br /> SLOPE AS <br /> "Finishing Instructions" for proper installation of <br /> DETERMINED - <br /> permanent coverings for unused openings and QLA$TEEL1 <br /> lifting lugs. <br /> 4.3 For Glasteel II tanks fabricated without <br /> ---- .. . . . <br /> dielectric isolation, (threaded nylon bushings or <br /> INERT SAND,flange isolation kits)this tank must,use either: PEA <br /> DE ouggn---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.